Send Message
Tel:
Jinzhou City Shitan Machinery Equipment  CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Home ProductsWater Well Drilling Rig Machine

150 Meters Deep Underground Borehole Water Well Drilling Rig Customized Diameter

150 Meters Deep Underground Borehole Water Well Drilling Rig Customized Diameter

  • 150 Meters Deep Underground Borehole Water Well Drilling Rig Customized Diameter
  • 150 Meters Deep Underground Borehole Water Well Drilling Rig Customized Diameter
150 Meters Deep Underground Borehole Water Well Drilling Rig Customized Diameter
Product Details:
Place of Origin: China
Brand Name: ShiTan
Certification: ISO
Model Number: XY-1A
Payment & Shipping Terms:
Minimum Order Quantity: 1 SET
Price: USD4200-4800/SET
Packaging Details: Plastic film and Standard export wooden box
Delivery Time: 7 DAYS AFTER PREPAID
Payment Terms: T/T, Western Union
Supply Ability: 2000SETS/YEAR
Contact Now
Detailed Product Description
Name: XY-1A Water Well Drilling Rig Machine Drilling Depth: 150 Meters
Drilling Hole Diameter: 150mm Hourse Power: 22 HP
Power: Diesel Engine Guarantee Time: 1 Year
OEM: Acceptable Place Of Origin: Hebei,China
Color: Yellow,Red And Blue After Sale Serive: Video Support
High Light:

Water Well Drilling Rig Customized Diameter

,

150 Meters Water Well Drilling Rig

,

Customized Diameter underground drilling rig

150 Meters Deep Underground Borehole Water Well Drilling Rig Machine With Customized Diameter

 

 

Product Description

 

XY-1A hydraulic drilling rig is a kind of widely used portable drill. It is suitable for drilling water well, geological survey,geological core drilling, small grouting holes, blasting holes of railway, water conservancy, bridges, dam foundation and otherbuildings . According to different strata, it drills by choosing diamond, composite films and alloy.

 

Product Technical Information

 

Drilling Rig
Drilling diameter(mm) 75,91,110,130,150,300
Drilling depth (m) 200,150,100,70,50,30
Drill pipe diameter (mm) 42,50
Drilling angle(°) 90~75
Equipment size(L * B * H) 1730 * 860 * 1360 (mm)
Rig weight (except engine) 700
Mobile device
Moving length 350mm
Leave distance 300mm
Gyrator
Spindle speed (four gear) (r/min) 115,230,505,1010
Spindle travel(mm) 450
Spindle no-load lifting maximum moving speed(m/s) 0.05
Spindle no load drop maximum movement speed(m/s) 0.067
Spindle maximum feed pressure(KN) 15
Spindle maximum lifting force(KN) 25
Spindle maximum output torque(KN• m) 1.5
Winch assembly
Winch maximum lifting force (single rope) 20
Reel speed (r/min) 20,39,85,170
Reel circumferential speed(m/s) 0.172,0.345,0.738,1.476
Reel diameter(mm) 140
Wire rope diameter(mm) 9.3
Wire rope density (m) 40
Brake diameter(mm) 278
Brake band width (mm) 50
Oil pump
Oil pump type YBC -20/125
Nominal pressure (Mpa) 12.5
Rated flow(ml/r) 20
Rated speed(r/min) 800-2500
Diesel engine or motor
Diesel engine 1115
Rated power (KW) 16.2
Rated speed (r/min) 2200
Rated pressure(Mpa) 12.5
Motor type Y160M - 4
Rated power (KW) 11
Rated speed (r/min) 1460


Product Advantages

 

Portable water well drilling rig is suitable for drilling water well,geological survey,geological core drilling,small grouting holes,blasting holes of railway,water conservancy,bridges,dam foundation and other buildings.According to different strata,it drills by choosing different bits,such as diamond composite films and alloy

 

Product Applications

 

Drilling rig is mainly used for geological general investigation and exploration,road and tall buliding foundation exploration,kinds of hole in concrete structure,river levees,subgrade grouting hole,drilling and driect grouting,civil wellsand earth temperature central air-conditioner,etc.

 

What aspects should we pay attention to in the drilling process of water well drilling rig?

 

Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.

1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.

2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.

3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.


 

 

150 Meters Deep Underground Borehole Water Well Drilling Rig Customized Diameter 0150 Meters Deep Underground Borehole Water Well Drilling Rig Customized Diameter 1150 Meters Deep Underground Borehole Water Well Drilling Rig Customized Diameter 2150 Meters Deep Underground Borehole Water Well Drilling Rig Customized Diameter 3150 Meters Deep Underground Borehole Water Well Drilling Rig Customized Diameter 4150 Meters Deep Underground Borehole Water Well Drilling Rig Customized Diameter 5

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: cathy

Tel: 13343314303

Send your inquiry directly to us
Jinzhou City Shitan Machinery Equipment CO. LTD.
Xiaoshang Village,Jinzhou City,Hebei province,China
Tel:86--15511892512
Mobile Site Privacy Policy | China Good Quality Water Well Drilling Rig Machine Supplier. © 2020 - 2024 drillingrigmachines.com. All Rights Reserved.