Send Message
Tel:
Jinzhou City Shitan Machinery Equipment  CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Home ProductsCrawler Mounted Drill Rig

150 Meters Deep Water Borehole Crawler Mounted Drilling Rig Xy-1A

150 Meters Deep Water Borehole Crawler Mounted Drilling Rig Xy-1A

  • 150 Meters Deep Water Borehole Crawler Mounted Drilling Rig Xy-1A
  • 150 Meters Deep Water Borehole Crawler Mounted Drilling Rig Xy-1A
150 Meters Deep Water Borehole Crawler Mounted Drilling Rig Xy-1A
Product Details:
Place of Origin: China
Brand Name: JINZHOU SHITAN
Certification: ISO
Model Number: XY-1A
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Neogotiation
Packaging Details: Standard Export Package
Delivery Time: 5-7 days
Payment Terms: T/T, Western Union
Supply Ability: 2000 sets per year
Contact Now
Detailed Product Description
Product Name: Xy-1A 150 Meters Deep Water Borehole Crawler Mounted Drilling Rig Condition: New
Type: Core Drilling Rig,water Well Drilling Power Type: Diesel
Voltage: Diesel Engine Driven Warranty: 1 Year, 12 Months, 6 Month, One Year, One Year(for Main Machine)
Drilling Depth: 100 Meters Drilling Hole Diameter: 100 Mm
Color: Yellow ,red OEM: Optional
After-sale Service: Video Support
High Light:

Diesel Crawler Mounted Drilling Rig

,

150M Crawler Mounted Drilling Rig

,

150M Crawler Mounted Drill Rig

Xy-1A 150 Meters Deep Water Borehole Crawler Mounted Drilling Rig

 

 

XY-1A Crawler Mounted Drilling Rig Introduction

 

XY-1A  is a  portable drilling rig with oil pressure feed. Rated drilling depth 150m; The drilling depth depends on the formation conditionsIt is suitable for industrial and civilian drilling, geothermal drilling and other well holes.

 

XY-1A Crawler Mounted Drilling Rig Parameter:

 

Drilling depth 150m
Drill rod caliber 50 42mm
End hole caliber 75 46mm
Max. open hloe caliber 220mm
Drilling angle 90°~75°
Drill weight (No include power) 610kg
Unity machine dimensions 2.1*0.9*1.3m
Spindle
spindle speed 130, 300, 480, 730, 830, 1045r/min
Spindle stroke 450mm
Hoist
Max.single line hoisting capacity 1600kg
Single line lifting speed 1.06, 0.67, 0.32m/s
Wirerope caliber 13mm
Wirerope cubic measure 35m
Hug floodgate caliber 254mm
Hug folldgate belt width 50mm
Distance between drill and hole 230mm
Mud pump
Type Horizontal single urn twin-action
Displacement 170L/min
Maximum pressure 1.5Mpa
Work pressure 0.7Mpa
Power
Diesle engine S1105 18HP
Electric motor Y160M—4 15KW
 


XY-1A Crawler Mounted Drilling Rig Features:

 

1. It improves drilling efficiency and reduces labor intensity With hydraulic automatic feeding mechanism.

2. Easy to operate, safe and reliable with ball clip holding mechanism or hydraulic chuck.

3. It has hole bottom pressure gauge to be easy to master the situation in the hole.

4. It also has advantage of Compact structure, concentrated handle, small footprint, light weight, strong decomposition, easy to move. It can be operated in plains and mountain areas.

 

XY-1A Crawler Mounted Drilling Rig Seeking Water:

 

It is well known that water flows to the place. As the saying goes, it is most beneficial to find water in the pinch land surrounded by mountains on three sides. Because of the low-lying terrain, the groundwater will flow to the pinch mouth. There is a high probability of drilling wells near the pinch mouth to get water. The two ditches intersect, and the spring water is choppy, that is, there may be water accumulation under the mountain mouth at the intersection of the two ditches.

 

Why is the water well drilling rig not suitable for use in rainy days?

 

After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large draw down pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain super elevation, and the frozen soil in the backfill in winter shall not exceed 15%.

 

150 Meters Deep Water Borehole Crawler Mounted Drilling Rig Xy-1A 0

 

150 Meters Deep Water Borehole Crawler Mounted Drilling Rig Xy-1A 1

 

150 Meters Deep Water Borehole Crawler Mounted Drilling Rig Xy-1A 2

 

 

 

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: cathy

Tel: 13343314303

Send your inquiry directly to us
Jinzhou City Shitan Machinery Equipment CO. LTD.
Xiaoshang Village,Jinzhou City,Hebei province,China
Tel:86--15511892512
Mobile Site Privacy Policy | China Good Quality Water Well Drilling Rig Machine Supplier. © 2020 - 2024 drillingrigmachines.com. All Rights Reserved.