Place of Origin: | China |
Brand Name: | ShiTan |
Certification: | ISO9001 |
Model Number: | GK-200 |
Minimum Order Quantity: | 1 set |
---|---|
Price: | USD4500-5800/SET |
Packaging Details: | wooden box |
Delivery Time: | Within 7-12 days |
Payment Terms: | T/T, Western Union |
Supply Ability: | 20000 sets per year |
Name: | GK 200 Borehole Drilling Rig | Power Type: | Diesel |
---|---|---|---|
Voltage: | 220v | Dimension(L*W*H): | 1730*860*1360 |
Application: | Water Well,railways, Core | Type: | Small Core Drill Rig |
Max Drilling Depth: | 200 Meter | Drilling Diameter: | 300 Mm |
Color: | Customized | Warranty: | 24 Months |
OEM: | Acceptable | Place Of Origin: | Hebei,China |
Highlight: | 220v borehole drilling machine,lightweight shallow borehole drilling machine,200 meters depth borehole driller |
GK 200 Borehole Drilling Rig
GK 200 Borehole Drilling Rig Description
GK200 is a lightweight shallow hole rig which can be drilling depth max 200M,diamter 75-300mm,with oil pressure feed.Mainly used for geological general investigation and exploration,road and tall buliding foundation exploration
GK 200 Borehole Drilling Rig Tech Data
GK 200 Borehole Drilling Rig | |
Drilling diameter(mm) | 75-300mm |
Drilling depth (m) | 200-30m |
Drill pipe diameter (mm) | 42,50 |
Drilling angle(°) | 90~75 |
Equipment size(L * B * H) | 1730 * 860 * 1360 (mm) |
Rig weight (except engine) | 700 |
Mobile device | |
Moving length | 350mm |
Leave distance | 300mm |
Gyrator | |
Spindle speed (four gear) (r/min) | 115,230,505,1010 |
Spindle travel(mm) | 450 |
Spindle no-load lifting maximum moving speed(m/s) | 0.05 |
Spindle no load drop maximum movement speed(m/s) | 0.067 |
Spindle maximum feed pressure(KN) | 15 |
Spindle maximum lifting force(KN) | 25 |
Spindle maximum output torque(KN• m) | 1.5 |
Winch assembly | |
Winch maximum lifting force (single rope) | 20 |
Reel speed (r/min) | 20,39,85,170 |
Reel circumferential speed(m/s) | 0.172,0.345,0.738,1.476 |
Reel diameter(mm) | 140 |
Wire rope diameter(mm) | 9.3 |
Wire rope density (m) | 40 |
Brake diameter(mm) | 278 |
Brake band width (mm) | 50 |
Oil pump | |
Oil pump type | YBC -20/125 |
Nominal pressure (Mpa) | 12.5 |
Rated flow(ml/r) | 20 |
Rated speed(r/min) | 800-2500 |
Diesel engine or motor | |
Diesel engine | 1115 |
Rated power (KW) | 16.2 |
Rated speed (r/min) | 2200 |
Rated pressure(Mpa) | 12.5 |
Motor type | Y160M - 4 |
Rated power (KW) | 11 |
Rated speed (r/min) | 146 |
GK 200 Borehole Drilling Rig Main Features
1.Engine:Feed by hydraulic cylinder,the drilling efficiency is higher and it can save labor.
2.Drill rod:53x59 drilling rod adopted,high rigidity and strong delivery torque.
3.Spindle:Vertical spindle are fixed by four groups of bearing to ensure that the rotary machine is rigid
enough for gravel layer and other complex geoloical conditions.
4.Mud pump:Equip mud pump with flow 160L/min,save cost and also make the structure compact.
5.Concentrated handle, small footprint,light weight, strong decomposition, easy to move.
What is the construction technology of de watering well?
Well point measurement and positioning → hole digging and casing embedding → drilling rig in place → drilling → hoisting well pipe → back-filling filter material (coarse sand or gravel) between well pipe and hole wall → hole washing → drainage pump in well pipe and installation of pumping control circuit → trial pumping → normal operation of well point → de watering completion, pipe pulling → well sealing.
The water well drilling rig is maintained at different times
The maintenance of water well drilling rig is very important, which can prolong the service life of the equipment, keep the water well drilling rig in a good operation state for a long time, reduce the maintenance cost and ensure the personal safety of operators.
1. Monthly maintenance:
Thoroughly carry out the items required by shift and weekly maintenance.
Remove the chuck and clean the slip and slip seat. Replace in time if damaged.
Clean the filter in the oil tank and replace the deteriorated or dirty hydraulic oil.
Check the main parts and components. If damaged, replace them in time. Do not work with injuries. Completely eliminate the faults occurred in this month.
If the well drilling equipment is not used for a long time, all exposed parts (especially the surface of the processing surface) shall be coated with grease.
2. Weekly maintenance:
Thoroughly carry out the items required by shift maintenance.
Remove the dirt and soil on the tooth surface of chuck and slip.
Clean the oil and mud on the inner surface of the holding brake.
Eliminate faults that occur within this week.
3. Shift Maintenance:
Check whether all exposed bolts, nuts and safety pins are firm and reliable.
Eliminate other faults in the shift.
Check the oil leakage everywhere and deal with it as appropriate.
Check the oil level of transmission, transfer case and hydraulic system oil tank.
Add lubricating oil or grease according to the lubrication requirements.
Wipe the external surface of the well drilling rig equipment, and pay attention to the cleanness and good lubrication of the surface of the well drilling rig base, slide-way, vertical shaft and so on.
Contact Person: cathy
Tel: +8613315955856