Place of Origin: | Hebei ,China |
Brand Name: | ST |
Certification: | ISO 9001 |
Model Number: | ST-180 |
Minimum Order Quantity: | 1set |
---|---|
Price: | 20000-35000 USD |
Packaging Details: | Wooden Package |
Delivery Time: | 5 -10 days |
Payment Terms: | T/T, Western Union, |
Supply Ability: | 2000 sets/month |
Product Name: | ST 180 Trailer Mounted Drilling Rig Machine | Drilling Depth: | 180 Meters |
---|---|---|---|
Drilling Hole Diameter: | 105-180 Mm | Weight: | 4.5T |
Dimension(L*W*H): | 3800*1500*2200mm | Walking Speed: | 2.5km/h |
Climbing Angles (Max.): | 30 | Equipped Capacitor: | 55KW |
Drill Pipe Diameter: | 76/89mm | OEM: | Acceptable |
Warranty: | 1 Year | After Sale Service: | Video Support |
Highlight: | pneumatic drilling trailer,customized drilling trailer,underground trailer mounted drilling rigs |
ST 180 Trailer Mounted Drilling Rig Machine Description
ST180 drilling rig can drill up to 180 meters and hole diameter is from 140mm to 254mm ,walking speed is 2.5km per hour ,this is very suitable for kinds of rocky drilling with high speed.Pneumatic water well drilling machine should be used together with air compressor, it can add mud pump and foam pump. Need to use different drilling tools such as: drill rod, hammer, rock drill bits, etc.
ST 180 Trailer Mounted Drilling Rig Machine Techical Data
Product Name |
ST 180 drilling rig
|
Drilling hole diameter
|
140-254mm
|
Drilling depth
|
180m
|
One-time advance length
|
3.3m
|
Walking speed
|
2.5km/h
|
Climbing angles (Max.) |
30
|
Equipped capacitor
|
55kw
|
Using air pressure
|
1.7-2.5mpa
|
Air consumption
|
17-31m³/min
|
Drill pipe length
|
1.5m, 2.0m, 3.0m
|
Drill pipe diameter
|
76mm, 89mm
|
Rig lifting force
|
12t
|
Swing speed
|
45-65rpm
|
Swing torque
|
3200-4600(N.m)
|
Dimension
|
3800*1500*2200mm
|
Weight
|
4500kg
|
ST 180 Trailer Mounted Drilling Rig Machine Fetures
This series of water well drilling machine has the characteristics of standardized configuration, compact and reasonablestructure, fast drilling speed, economical and durable, low failure rate, etc. It has been recognized by the market once it islaunched, and has been widely used in mining engineering construction, civil drilling, geothermal drilling and other fields.
ST 180 Trailer Mounted Drilling Rig Machine Packing Information
1.Water well drilling rig is firmly fixed with steel wire ropes to ensure the safety and no damage of the cargo during transportation.
2.Screw Air Compressor is firmly fixed with steel wire ropes to ensure the safety and no damage of the cargo during transportation.
3.Drilling Tools (such as hammer, drill bit, adapter, etc.) are packed in strong wooden case, it can keep cargo safety and no damage.
4. Drill Rods are Packed in pallets, it can keep cargo safety and no damage
What problems should be paid attention to during water exploration?
Before water exploration, b must make the following preparations and * * measures:
(1) Before water exploration, the roadway support near the water exploration site shall be reinforced and the roof shall be well supported to prevent the roadway wall and support from being washed down by pressure water.
(2) Clean the roadway to ensure that the evacuation route of * * is unobstructed. Ladders and handrails shall be set for inclined roadways above 20.
(3) The drainage ditch with proper section and gradient shall be excavated in advance to make the water flow smooth. At the same time, there shall be water sump and drainage equipment with corresponding capacity.
(4) The * * communication equipment shall be installed at or near the drilling site, and the communication system shall also be installed in the area related to the water exploration site. In this way, once the head-on water penetration occurs and cannot be controlled, the personnel in the danger area can be immediately notified to evacuate quickly according to the specified route.
Contact Person: cathy
Tel: +8613315955856