Place of Origin: | China |
Brand Name: | JINZHOU SHITAN |
Certification: | ISO9001 |
Model Number: | ST-50 |
Minimum Order Quantity: | 1 set |
---|---|
Price: | Negotiation |
Packaging Details: | Standard Export Package |
Delivery Time: | 3 days |
Payment Terms: | T/T, Western Union |
Supply Ability: | 5000 sets per year |
Product Name: | ST 50 Borehole Drilling Rig Machine | Drilling Depth: | 50 Meters |
---|---|---|---|
Condition: | New | Type: | Core Drilling Rig |
Power Type: | Electric | Usage: | Coal |
Voltage: | 380V | Warranty: | 1 Year |
Material: | Steel | Color: | Optional Red,Yellow |
Customized: | Acceptable | Brand Name: | Shitan |
Highlight: | 50 meters borehole drilling machine,exploration lightweight borehole drilling machine,50 meters borehole drilling rig |
ST 50 Small Lightweight Borehole Drilling Rig Machine
ST 50 Borehole Drilling Rig Machine:
This drilling rig is light weight, simple structure, fast drilling speed and large diameter of coring samples. It is a commonly used portable hydraulic drill. Max drilling depth is 50 meters ,and hole diameter can be around 110m.
ST 50 Borehole Drilling Machine Tech Data:
Max drilling depth | 50m |
Max .opening diameter | φ75-φ108mm |
End hole diameter | 56-75mm |
Active drill pipe | 50/1000mm |
Drill pipe diameter | Φ42mm |
Drill pipe length | 1000mm |
Power (diesel engine) | 5.8kw(8P)/2200r/min |
Size | 1400*600*1600mm |
Weight | 240kg |
Spindle | |
Speed | 285-570r/min |
Torque | 600 N*m |
Stroke | 1000mm |
Lifting force | 300KG |
Pressure | 200KG |
Drilling Tower (optional) | |
Rated load | 1t |
Height | 4m |
Tower leg specifications | 60mm |
Mud Pump | |
Model | BW-50 |
Flow | 50L/min |
Max.pressure | 1.2Mpa |
Times | 63/min |
Inlet hose diameter | φ55mm*2.5m |
Outlet hose diameter | Φ20mm*10m |
ST 50 Borehole Drilling Machine Main Advantages:
Shitan Machinery Drilling Rig Several Attention:
Q 1: What kind of drilling rig do you have?
A: We mainly produce small hydraulic drilling rig, water well drilling rig, core drilling rig, engineering drilling rig, geological exploration drilling rig, etc., and we will recommend the suitable model according to your exact requirement .
Q 2: Where is the address of your company?
A: Our factory is in Jinzhou, Shijiazhuang City, Hebei Province, China
Q 3: Are you a manufacturer or a trading company?
A:We are a 20 years professional manufacturer with ISO certificate. We have a large modern drilling rig plant in Hebei, China.
Q 4: How long is your delivery time?
A: Small hydraulic drilling rigs generally take 5-7 days, and large pneumatic water well drilling rigs generally take 7-15 days. If there is an urgent order, please contact our sales in advance.
Q 5: How long is the warranty of your well drilling rig?
A: Except for consumable spare parts, the whole machine shall be one year.
How is exploration drilling done?
Drilling consists of sinking a drill string into the ground while injecting a special mud. This allows fragments of rock and samples of gas to be brought back to the surface. Boreholes have to be drilled at several locations to delineate the potential deposit.
Contact Person: cathy
Tel: +8613315955856