Place of Origin: | China |
Brand Name: | JINZHOU SHITAN |
Certification: | ISO9001 |
Model Number: | Gy 200 |
Minimum Order Quantity: | 1 set |
---|---|
Price: | Negotiation |
Packaging Details: | Standard Export Package |
Delivery Time: | 7-12 days |
Payment Terms: | T/T, Western Union |
Supply Ability: | 20000 sets per year |
Product Name: | GY 200 Coring Investigation Trailer Mounted Drilling Rigs For Rocky Mining | Type: | Core Drilling Rig,Exploration |
---|---|---|---|
Power Type: | Diesel | Drilling Depth: | 300m |
Usage: | Water Well,geological Exploration | Voltage: | 380V |
Power(W): | 16.2kw | Dimension(L*W*H): | 1730*860*1360mm |
Drilling Diameter: | 75-200mm | Engine: | Diesel Power |
Color: | Yellow,Red And Blue | OEM: | Acceptable |
Highlight: | 300 meters soil investigation drilling machine,high speed soil investigation drilling machine,300 meters trailer mounted drilling rigs |
GY 200 Coring Investigation Trailer Mounted Drilling Rigs For Rocky Mining
Gy 200 Trailer Mounted Drilling Rigs Introduction:
GY-200 Drilling Rig is a light multifunctional engineering project prospecting drilling rig.Its depth is 300 meters ,and hole diameter can be customized.This model is the small hydraulic drilling rig king.hydraulic drilling rig is a kind of widely used portable drill. It is suitable for drilling water well, geological survey,geological core drilling, small grouting holes, blasting holes of railway, water conservancy, bridges, dam foundation and otherbuildings . According to different strata, it drills by choosing diamond, composite films and alloy.
Gy 200 Trailer Mounted Drilling Rigs Technical Information:
Drilling depth | 60 225 295m |
Drilling diameter | 300 76 46mm |
Drill pipe diameter | 50 42mm |
Spindle Turnable Angle | 0-360degree |
Net weight(excluding the power machine) | 670kg |
Dimension(length*width*height) | 1820*980*1400mm |
Revolving Plate | |
Spindle speed | 900 475 388 205 157 68 r/min |
Maximum torque | 2000N*m |
Driving travel | 400mm |
Maximum Cylinder driving force | 2,9000N |
Maximum Cylinder lifting force | 3,9000N |
Lifter | |
Lifting capacity | 3,0000N |
Bobbin line speed (2 layers) | 0.27 0.64 0.83 1.58 1.64 m/s |
Bobbin diameter | 135mm |
Gy 200 Trailer Mounted Drilling Rigs Advantage
Our serial core drilling rigs covers all the main foundation and drilling technologies with a range of models whose characteristics, capability and performance find application in every operating condition.The drilling rig is suitable for engineering geological survey of buildings such as civil engineering, railways, hydropower, transportation, bridges, dam foundations, etc.
Gy 200 Trailer Mounted Drilling Rigs Application
Our Geotechnical Drilling Rigs are the spindle drilling rigs widely used for geotechnical Soil Sampling drilling, diamond core drilling for metallic ferrous or nonmetallic solid deposits exploration, water well drilling, geothermal well drilling and drilling of superficial-zone petroleum and natural gas mining, mines' gallery ventilation, water discharge tunnel, as well as the foundation & construction drilling for high-rise building, highway, railway, bridge, port, harbor work, piling, dam and tunnel, etc.
How to deal with sticking of water well drilling rig?
During the drilling operation of water well drilling rig, the common problem is sticking. The phenomenon that the pipe string and tools can not be lifted, lowered or rotated in the well is called sticking. In case of this phenomenon, the drilling rig can no longer work normally.
According to the current strength of the drill bit, the broken wing has been basically eliminated. In case of special circumstances, a section of seamless pipe with a diameter almost the same as the hole diameter can be used. The pipe is filled with butter, asphalt and other materials, which are connected with the drill pipe into the hole bottom. The broken wing at the hole bottom is taken out. The rock powder at the hole bottom is blown out before fishing.
In severe cases, the drilling tool can not be lifted or put down, and the impactor does not sound. At this time, only external torque or auxiliary tools can be used to help promote the drilling tool, so as to make the drilling tool rotate. Then, the drilling tool should be promoted while supplying gas until the fault is removed. When re drilling, pressure shall be applied first, and then the propulsive force shall be gradually increased until the normal working pressure.
Contact Person: cathy
Tel: +8613315955856