Place of Origin: | China |
Brand Name: | ShiTan |
Certification: | ISO |
Model Number: | ST-300 |
Minimum Order Quantity: | 1 set |
---|---|
Packaging Details: | standard export packing |
Delivery Time: | 7-10 days |
Payment Terms: | T/T, Western Union |
Supply Ability: | 5000 sets per year |
Product Name: | ST 300 Customized Large Drilling Equipment With Air Compressor ,Water Well Drilling Rig Machine | Hole Diameter: | 105-350mm |
---|---|---|---|
Drilling Depths: | 300 Meters | Place Of Origin: | China (Mainland) |
Model Numbe(m): | ST-300 | Voltage: | Differ |
Certification: | ISO,CE,SGS,TUV,BV | Warranty: | 1 Year |
Material: | Steel | OEM: | Customized Drilling Rig |
Color: | Yellow ,Red,blue | After Sale Service: | Video Support |
Highlight: | 300m water well drilling equipment,air compressor water well drilling equipment,300m water well drilling truck |
ST 300 Customized Large Water Well Drilling Rig Machine
ST 300 Water Well Drilling Rig Machine Descrption:
ST 300 drilling rig is efficient and multifunctional drilling equipment , it is mainly applicable to industrial and civil drilling, geothermal drilling, has the advantages of compact structure, fast advancing, mobile and flexible wide application region etc.. It is especially suitable for water intake in mountainous and rocky strata.
ST 300 Water Well Drilling Rig Machine Main Parameter:
Technical Parameters Infomation | |
Model Name | ST 300 |
Drilling Rig Dimension | 5900*2000*2850mm |
The hole diameter | 140-325mm |
Drilling depth | 300m |
One-time advance length | 3m |
Walking speed | 2.5KM/H |
Climbing angles | 30 |
Power | 84KW |
Using air pressure | 1.7-3.3MPA |
Air consumption | 17-35cubic meter/min |
Drill pipe length | 2 meter or 3 meter |
Drill pipe diameter | 102mm,89mm |
Rig lifting force | 20T |
Swing speed | 55-115rpm |
Swing torque | 6200-8500N.m |
ST 300 Water Well Drilling Rig Machine Advantages:
ST 300 Water Well Drilling Rig Machine Applications:
When the well bit slips, it can be handled.
After two times of tripping in, the thickness of the muck is determined through the number on the display. After looking at the soft and hardness of the dropped address, if there is a lot of soil and it is hard clay, a drill bucket smaller than the pile diameter is used to solve the problem of slipping. Because there is a large gap between the diameter drill bucket and the hole wall, the dropped soil is under the action of the total amount of drill pipe bucket and pressure, Through the gap between the drill bucket and the hole wall, the small-diameter drill bucket can normally drill when it contacts the solid soil. The large-diameter drill bucket is squeezed into the small hole after two times of running in, so that the large-diameter drill bucket can normally enter the small hole
Contact Person: cathy
Tel: +8613315955856