Send Message
Tel:
Jinzhou City Shitan Machinery Equipment  CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Home ProductsCrawler Mounted Drill Rig

Lightweight ST-200 200 Meter Crawler Mounted Drilling Rig

Lightweight ST-200 200 Meter Crawler Mounted Drilling Rig

  • Lightweight ST-200 200 Meter Crawler Mounted Drilling Rig
  • Lightweight ST-200 200 Meter Crawler Mounted Drilling Rig
Lightweight ST-200 200 Meter Crawler Mounted Drilling Rig
Product Details:
Place of Origin: China
Brand Name: JINZHOU SHITAN
Certification: ISO
Model Number: ST-200
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiation
Packaging Details: Standard Export Package
Delivery Time: 7-10 days
Payment Terms: L/C, D/A, D/P, T/T, Western Union
Supply Ability: 2000 sets per year
Contact Now
Detailed Product Description
Condition: New Type: Core Drilling Rig
Power Type: Diesel Usage: Water Well
Voltage: 220V/380V Power(W): 2200kw
Dimension(L*W*H): 2700x950x1770mm Warranty: 1 Year
High Light:

200M Crawler Mounted Drilling Rig

,

ST200 Crawler Mounted Drilling Rig

,

Lightweight rock well drilling

200 Meter Rock Well Drilling Borehole Crawler Mounted Drilling Rig

 

 

Product Advantage:

 

1.Drilling rig uses automatic telescopic drilling rig(Julong patent),it uses two high-strength cylinders to support.There is a group of hydraulic valves to control supination of drill tower so that it saves time and effort, safe and reliable when user operates, the maximum for the user to create benefits.

 

2.The chassis uses a rubber belt track so that the weight is light,the cost of life cycle is lower.It can reduce noise of the vehicle walking mechanism,reduce car body's shake,redue the oil consumption.It can walk on the pavement of city and don't hurt the pavement.

 

3.The chassis comes with four high-strength threaded legs(or Hydraulic high leg) the threaded legs installate and adjust is fast and convenient, can be used for work plane leveling.It can make loading and unloading reduce the cost of to improve efficiency.It also can be used as auxiliary support when the track drilling rig is working.

 

4.Using 48V electric starting diesel engine is reduced the operate's labour intensity greatly.Especially in cold season,when diesel engine start hardly,it will show superiority vastly.

 

5.The machine is equipped with BW-160 independent mud pump,the pump flow and pressuer are big,the maintenance is convenient,the parts of the machine are convenient to buy all over the country.

 

6.There are several kinds of models,for example ST-300/ST-200/ST-180/ST-150/ST-100.

 

Product Parameter:

 

Maximum opening diameter 400mm
Maximum borehole depth 200m
Diameter of the end hole 75mm
Borehole dip angle 90-75°
Machine overall size 2.75X0.95X1.60m
Drill pipe diameter 50mm
Weight of drill rig (without power) 760kg
A vertical scroll of painting  
Shaft rotation speed 71/142/310/20 r/min
Vertical axis stroke 450mm
Windlass
Maximum lifting weight of single rope 2008kb
Drum lifting speed 17/35/75/160rm/s
Wire rope diameter: 13mm
Wire rope capacity 35mm
Width of sluice 70mm
Mud pump
Type: horizontal single cylinder double action flow:180L/min
Maximum pressure 1.5mpa
Working pressure 0.7mpa
Inlet Size 50mm
Outlet pipe diameter 45mm
Power
Diesel oil 20hp
Rated speed 2200r/min
Electric machinery 15kw
Rated speed 1460r/min

 

Matters Needing Attention in Drilling Process Of Crawler Drilling Rig

 

1. After drilling structure of crawler drill bit, the center drilling tool needs to be replaced in time. Firstly, the hole bottom needs to be cleaned, and then the residue at the bottom of the hole is blown clean. After the bit stops rotating, the drilling tool in the drilling rig is slowly lifted up. When the lifting force is good enough to lift the drilling tool, it is appropriate.

 

2. When the drill bit of crawler drilling rig is summarized in the drilling process, it is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and timely keep the hole clean when necessary, and the drill bit in the drilling rig is not allowed to pull out forcefully during the drilling process.

 

3. Sometimes more residual rock slag will be left at the bottom of the hole of crawler drilling rig, and the rotary part of the eccentric bit will be blocked by the rock slag, which will affect its closing production. At this time, it is necessary to transport compressed air, clean the hole again, and make the DTH hammer work for a short time, and then lift the central drilling tool again.

Lightweight ST-200 200 Meter Crawler Mounted Drilling Rig 0

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Anna

Tel: 15511892512

Send your inquiry directly to us
Jinzhou City Shitan Machinery Equipment CO. LTD.
Xiaoshang Village,Jinzhou City,Hebei province,China
Tel:86--15511892512
Mobile Site Privacy Policy | China Good Quality Water Well Drilling Rig Machine Supplier. © 2020 - 2024 drillingrigmachines.com. All Rights Reserved.