Place of Origin: | China |
Brand Name: | JINZHOU SHITAN |
Certification: | ISO |
Model Number: | ST-150 |
Minimum Order Quantity: | 1 set |
---|---|
Price: | Negotiation |
Delivery Time: | 7-10 days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union |
Supply Ability: | 2000 sets per year |
Drilling Depth: | 150m | Condition: | New |
---|---|---|---|
Hole Diameter: | 150mm | Max. Speed: | 690 |
Weight: | 600kg | Drill Rod: | 42 Or 50mm |
Highlight: | dth drilling machine,water borehole drilling machine |
Exported Water Well Geological Drilling Rig Machine for Siting Investigation
Product Feature:
1.Hydraulic driven, smooth transmission, low noise, compacted control panel, easy to operate, labor-saving, safe and reliable.
2.Crawler chassis mounted, convenient and fast to move and position.
3.Main arm can move up and down, drilling tower slides on sliding frame, stable, safe and reliable.
4.Sliding frame can swing back and forth on the main arm seat, achieving drilling in angles, Besides, a meter is equipped on the sliding frame, showing drilling angles conveniently.
5.Moving of power head is driven by cylinder chain multi speed system with dual chain balance structure.
6.Multifunctional power head has features of sliding clearance compensation and adjustment compensation and stepless speed adjustment large torque slow speed
7.Power head has wide speed range, which can meet the requirement of various formation and different drilling process.
Main Parameter:
Basic Parameters | |
Drilling depth | 150m |
Drilling diameter | 300mm |
Drill pipe diameter | 42mm |
Gross weight of drilling machine(engine not included) | 500kg |
Dimension (length ×width × height) | 2050 × 1180 × 1420 mm |
Revolving Plate | |
Rotate speed | 60 200 400 610 1100 r/min |
Maximum torque | 1800N*m |
Driving travel | 450mm |
Maximum Cylinder driving force | 20,000N |
Maximum Cylinder lifting force | 30,000N |
Lifter | |
Lifting capacity | 24,000N |
Bobbin line speed (2 layers) | 0.20 0.72 1.26 2.8 m/s |
Bobbin diameter | 140mm |
Rope diameter | 11mm |
Rope capacity | 26m |
Drilling rig | |
Type | Steel pipe quadripod |
Height | 6m |
Drive motor | |
Type | Changzhou ZS1100 diesel engine |
Rated power | 11.03KW |
Tare weighr | 150kg |
There are seven points for attention in the construction process of Geological Drilling Rig
1. The operators of water well drilling rig shall be trained and qualified and take up the post with certificate.
2. The equipment entering the site shall meet the construction requirements, and the trial operation test shall be conducted before the formal start-up of the well drilling rig, and the operation status shall be stated in time.
3. The specific drilling process should be prepared, the operation rules and standards of water well drilling equipment should be prepared, and the construction records should be made.
4. During the drilling process, it is not allowed to rotate until the planned elevation is reached. Maybe if the drill pipe needs to be rotated or raised under special circumstances, the drill pipe should be lifted to the surface, and the bit valve should be dredged and closed from the beginning. The operator should strictly control the descent speed and rotation speed of the threaded bit.
5. Before drilling, carefully check whether the air hole at the top of the core pipe is smooth, whether the concrete delivery hose joint is outstanding, and whether there is distorted appearance.
6. In the process of hole forming, when the drill pipe is found shaking or the footage is slow, the footage should be slowed down to avoid pile hole deflection, displacement and damage of drill pipe and drilling tool.
Contact Person: cathy
Tel: +8613315955856