The maintenance work completed by the water well drilling rig after infrastructure assembly.
(1) Open gases, liquids, and water pipes should be sealed accordingly, and the interior and connectors of the pipes should be kept clean to prevent contamination by debris.
(2) When disassembling fasteners, please tighten the clips, label them, or place them in a specialized box.
(3) The independently packaged spiral and spiral are packaged separately to prevent mixing with high-strength spiral.
(4) The software of the air system can remove oil stains and problems with water well drilling rigs. The plastic packaging can be cleaned by tightening the outside of each pipe, scraping screws, and maintaining the cleanliness of the inside of the pipe.
(5) When disassembling or hanging, be careful not to damage the machine equipment.
(6) When placed outside or for a long time, it will not be exposed to rain, moisturize, prevent dirt, and be prepared for packaging
(7) All liquids (oil, water) in machine equipment are used as dry emissions.
Contact Person: Miss. Anna
Tel: 15511892512