First of all, check the structure of the water well drilling rig, especially before use, check the integrity of parts and components, and put it into use only after it is qualified. In the process of use, various power head oil cylinders and other places shall be inspected regularly to ensure their normal operation.
The electrical system shall also be inspected regularly, as well as the pulley system and traveling system of the drilling rig. Better maintenance records shall be made for each physical examination of the equipment, and records shall also be made for each replacement of parts. If problems are found, the operation must be stopped to avoid unnecessary losses.
Pay attention to some operation methods during use. Pay attention to the lubrication of parts and apply lubricating oil appropriately. When the working face is in the water, the drill head with large diameter shall be used to open the hole, and the drill pipe shall be inserted to make the drill pipe 1-2 meters above the water surface, so as to prevent mud and rock slag from falling into the hole and blocking. The drill shall not be reversed during drilling operation to avoid the drill pipe falling into the hole. At the end of each shift, the dirt on the surface of the drilling rig must be cleaned in time. Except for normal handling, it is strictly prohibited to disassemble it on the working face.
As long as attention is paid to good maintenance and correct use, the service life of water well drilling rig can be increased.
Contact Person: Miss. Anna
Tel: 15511892512