Place of Origin: | China |
Brand Name: | ShiTan |
Certification: | ISO |
Model Number: | ST-300 |
Minimum Order Quantity: | 1 set |
---|---|
Packaging Details: | standard export packing |
Delivery Time: | 7-10 days |
Payment Terms: | T/T, Western Union |
Supply Ability: | 5000 sets per year |
Product Name: | ST 300 Water Well Drilling Rig Machine | Hole Diameter: | 105-350mm |
---|---|---|---|
Drilling Depths: | 300 Meters | Engine: | Diesel Engine |
Place Of Origin: | China (Mainland) | Model Numbe(m): | ST-300 |
Warranty: | 12 Months | Material: | Steel |
OEM: | Acceptable | Color: | Yellow ,Red,blue |
After Sale Service: | Video Support | ||
Highlight: | 300m Crawler Mounted Drilling Rig,Customizale Crawler Mounted Drilling Rig,Customizale DTH Drilling Rig |
ST 300 Water Well Drilling Rig Machine DTH Blasting
Product Descrption
ST 300 drilling rig is efficient and multifunctional drilling equipment , it is mainly applicable to industrial and civil drilling, geothermal drilling, has the advantages of compact structure, fast advancing, mobile and flexible wide application region etc.. It is especially suitable for water intake in mountainous and rocky strata.
Product Main Parameter
Technical Parameters | |
Model Name | ST 300 |
Drilling Rig Dimension | 5900*2000*2850mm |
The hole diameter | 140-325mm |
Drilling depth | 300m |
One-time advance length | 3m |
Walking speed | 2.5KM/H |
Climbing angles | 30 |
Power | 84KW |
Using air pressure | 1.7-3.3MPA |
Air consumption | 17-35cubic meter/min |
Drill pipe length | 2 meter or 3 meter |
Drill pipe diameter | 102mm,89mm |
Rig lifting force | 20T |
Swing speed | 55-115rpm |
Swing torque | 6200-8500N.m |
Product Advantages:
Product Application Scope
How to solve the well bit slips?
After two times of tripping in, the thickness of the muck is determined through the number on the display. After looking at the soft and hardness of the dropped address, if there is a lot of soil and it is hard clay, a drill bucket smaller than the pile diameter is used to solve the problem of slipping. Because there is a large gap between the diameter drill bucket and the hole wall, the dropped soil is under the action of the total amount of drill pipe bucket and pressure, Through the gap between the drill bucket and the hole wall, the small-diameter drill bucket can normally drill when it contacts the solid soil. The large-diameter drill bucket is squeezed into the small hole after two times of running in, so that the large-diameter drill bucket can normally enter the small hole
Contact Person: cathy
Tel: +8613315955856