Send Message
Tel:
Jinzhou City Shitan Machinery Equipment  CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Home ProductsCrawler Mounted Drill Rig

St 450 Deep Underground Water Borehole Crawler Drilling Rig For Farming Or Construction

St 450 Deep Underground Water Borehole Crawler Drilling Rig For Farming Or Construction

  • St 450 Deep Underground Water Borehole Crawler Drilling Rig For Farming Or Construction
  • St 450 Deep Underground Water Borehole Crawler Drilling Rig For Farming Or Construction
St 450 Deep Underground Water Borehole Crawler Drilling Rig For Farming Or Construction
Product Details:
Place of Origin: Hebei China
Brand Name: Shitan
Certification: ISO 9001
Model Number: ST-450
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: 75000 USD
Packaging Details: Wooden box
Delivery Time: 15 days
Payment Terms: T/T, Western Union
Supply Ability: 2000 sets/month
Contact Now
Detailed Product Description
Product Name: ST 450 Crawler Mounted Drilling Rig Machine Drilling Depth: 450 Meters
Drilling Diameter: Φ140-Φ350mm Dimension: 5900x2100x2850mm
Feeding Type: Hydraulic One Push Length: 6M
Length Of Drill Pipe: 1.5m, 2.0m, 3.0m,6.0m Drilling Pipe Diameter: Φ89, Φ102mm, Φ108mm
Weight: 9.8T Working Air Pressure: 1.7-3.5MPa
After-sales Service Provided: Video Technical Support Color: Blue,Yellow,Red
High Light:

450m crawler drill machine

,

blasting crawler drill machine

,

450m crawler mounted drill rig

St 450 Deep Underground Water Borehole Crawler Drilling Rig

 

 

St 450 Crawler Mounted Drill Rig Introduction
 
It is powered by Yuchai 92 kW six cylinder engine, with a lifting force of 24 tons, a tower stroke of 6.78 meters and a Liko rotary motor. High leg travel, easy to get on and off. Steel crawler chassis, drill size 6.4 * 2.1 * 2.6.The water well drill rig the drilling diameter is 140-305mm and the drilling depth can reach to 180 meters, which can meet most of the farming or construction water well requirement, besides, a Small size, light weight, flexible movement, convenient transportation, etc

 

St 450 Crawler Mounted Drill Rig Technical Data
 

Drilling Rig

No.

ST 450

Max drilling depth

M

450

Drilling diameter

mm

105-325

Air pressure

Mpa

1.2-3.5

Air consumption

m3 /min

16-55

Drill pipe length

m

6

Drill pipe diameter

mm

89/102

Axial pressure

T

4

Lifting force

T

22

Fast lifting speed

m/min

29

Fast feeding speed

m/min

56

Max rotary torque

Nm

8000/4000

Max rotary speed

r/min

75/150

Big auxiliary winch lifting force

T

-

Small auxiliary winch lifting force

T

1.5

Jacks stroke

m

1.6

Drilling efficiency

m/h

10-35

Driving speed

Km/h

2.5

Uphill angle

slope

21°

Weight of drilling rig

T

9.8

Dimension

m

6.2*1.85*2.55

Working condition

Unconsolidated formation and bedrock

Drilling methods

DTH hammer or mud drilling

Matched DTH hammer

Medium and high air pressure series

 
St 450 Crawler Mounted Drill Rig Advantages:
 

1.Four independently operated large bore hydraulic jack cylinders, and the main engine can rise and fall automatically through hydraulic drive; Users can choose high outriggers according to their own needs, and the lifting height can reach 1.5m. It can simply complete loading and unloading, and completely solve the troubles of user equipment transfer.
2. The four leg cylinders can be controlled separately to facilitate the adjustment of the vertical angle between the borehole and the ground during drilling, and ensure the stability of the whole machine during drilling.
3. The two-stage air filter intake design ensures the normal service life of diesel engine and air compressor under harsh construction conditions.
4. The main shaft of the power head realizes six gear rotation and stepless adjustable propulsion speed, which can meet the drilling needs of various complex strata such as soil layer and rock layer, so that the drill has a very wide range of applicability.
5. Centralized control hydraulic console for easy operation. Two sets of four pumps are designed to facilitate maintenance and reduce maintenance cost.
6. This series of drilling rig adopts excavator crawler chassis, with strong off-road performance and convenient transfer.
7. The newly designed drill pipe hoist makes the loading and unloading of drill pipe faster and lighter.
8. (optional) it is equipped with arc welding generator to facilitate on-site welding maintenance and provide night construction lighting
 

Drilling Operation Technology

 

① Proper casing shall be put into the hole to avoid hole collapse.

② When the drilling tool is lowered into the hole, first use low-pressure slow rotation to sweep the hole to the bottom. When the resistance of the drill bit in the hole is small, it can be turned into normal drilling. If the resistance in the hole is large, it cannot be forced to open the high speed.

③ During normal drilling, the drilling parameters shall not be changed arbitrarily, and the drilling tools shall not be lifted to prevent the core from being blocked.

④ When the core is found to be blocked, the drilling tool can be lifted appropriately. If the treatment is ineffective, the drilling tool should be lifted immediately.

⑤ If the formation is loose, the particle size of sand and gravel is very small, and it is difficult to coring, the pump volume should be reduced.

⑥ If the drilling speed of sand and gravel suddenly accelerates, it may be to drill into the sand layer or the gravel layer with small particle size. It is not necessary to change the drilling parameters, but the pump volume should be reduced as much as possible.

⑦ In order to ensure that the core is drilled into thin sand and mud layers, it is best to drill more than 10 cm into the pebble layer after drilling. If the sand layer is thick, when one round of drilling cannot be penetrated, the pump should be stopped at the end of the round to dry drilling for more than 10 cm and then lift the drill to prevent the core from falling off.

⑧ Carefully operate during drilling, and often observe whether the water supply system is unblocked and whether the water pump operates normally. When there is no slurry return in the hole, slurry breaking shall be prevented. In case of sudden increase in pump pressure, immediately lift the drill for inspection to prevent burning.

⑨ When drilling and sampling in important hole sections, the drill rod should be slowly lifted and screwed down to prevent the core from falling off. When withdrawing the core, the drill bit should be removed and then the core should be gently poured out.

 
FAQ St 450 Crawler Mounted Drill Rig
 
1. Are you manufacturer or trade company?
We are a direct professional factory
2. What about the Minimum order quantity?
The MOQ is 1 set.
3. Could your company offer customize service to customers ?
Yes, we offer customize service.
4. What is your terms of payment?
Trade Assurance, T/T, Credit Card.
5. What is your terms of delivery?
EXW, FOB, CFR, CIF.
 
St 450 Deep Underground Water Borehole Crawler Drilling Rig For Farming Or Construction 0

St 450 Deep Underground Water Borehole Crawler Drilling Rig For Farming Or Construction 1St 450 Deep Underground Water Borehole Crawler Drilling Rig For Farming Or Construction 2

St 450 Deep Underground Water Borehole Crawler Drilling Rig For Farming Or Construction 3
St 450 Deep Underground Water Borehole Crawler Drilling Rig For Farming Or Construction 4
St 450 Deep Underground Water Borehole Crawler Drilling Rig For Farming Or Construction 5St 450 Deep Underground Water Borehole Crawler Drilling Rig For Farming Or Construction 6

 
 
 

 
 
 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: cathy

Tel: 13343314303

Send your inquiry directly to us
Jinzhou City Shitan Machinery Equipment CO. LTD.
Xiaoshang Village,Jinzhou City,Hebei province,China
Tel:86--15511892512
Mobile Site Privacy Policy | China Good Quality Water Well Drilling Rig Machine Supplier. © 2020 - 2024 drillingrigmachines.com. All Rights Reserved.