Place of Origin: | China |
Brand Name: | SHITAN |
Certification: | ISO |
Model Number: | ST-50 |
Minimum Order Quantity: | 1 set |
---|---|
Price: | 3600-4500USD |
Packaging Details: | wooden box |
Delivery Time: | 7 days |
Payment Terms: | T/T, Western Union |
Supply Ability: | 2000 sets/day |
Product Name: | 50 Meters Mini Easy Operation Portable Water Well Drilling Rig | Hole Diameter: | 42mm |
---|---|---|---|
Drilling Depth: | 50M | Size: | 0.8M3 |
Diamter Of Bore Hole: | 73-108m | Rotatory Speed: | 70-650 R/min |
Reverse Speed: | 50-130r/min (R) | Deisel Power: | 5.7KW |
Weight: | 180KG | Type: | Rotary Drilling Rig,High Pressure Crawler Drill,Core Drilling Rig |
Condition: | New | Color: | Red,Yellow |
High Light: | mini portable water well drilling rig,farming portable water well drilling rig,50meters depth portable well drilling rig |
ST50 Portable Water Well Drilling Rig Bore Well Drilling Machine
ST 50 Water Well Drilling Rig Brief Description
It is a kind of widely used portable drill,easy movement ,light weight and competitive price,It is suitable for drilling water well, geological survey, geological core drilling, small grouting holes, blasting holes of railway, water conservancy, bridges, dam foundation and other buildings . According to different strata, it drills by choosing diamond, composite films and alloy.
ST 50 Water Well Drilling Rig Tech Data
Diamter of bore hole | 73-108m |
depth | 50m |
Drill rod dia. | 42m |
Rotatory speed | 70-650 r/min |
Reverse speed | 50-130r/min (R) |
Deisel power | 5.7kw |
Drill machine dimension | 1180*680*1600mm |
Weight | 180kg |
ST 50 Portable Water Well Drilling Rig Advantages
Start drilling:
Push on the clutch handle and reducer handle, the mud pump starts to supply water, press the hydraulic right handle and rotate the left handle pressure regulating valve to start drilling. When the vertical shaft of the rotator falls to the bottom, pull down the clutch handle to cut off the power. Lift the support ring, lift the right hydraulic handle up to the up position, press the left hydraulic handle, lift the vertical shaft to the highest position, press the support ring, push up the clutch handle, press the right hydraulic handle down to the down position, start drilling again, operate repeatedly according to the above operation mode until the maximum drilling depth of the active drill pipe is reached, and then replace and install the drill pipe.How can a person change the drill pipe? First, pinch one end of the locking handle with the cushion fork, pull a three meter drill pipe into the hole with the puller, remove the puller, close the closing box, pull down the operating handle of the drilling rig ect
Contact Person: cathy
Tel: 13343314303