Send Message
Tel:
Jinzhou City Shitan Machinery Equipment  CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Home ProductsBorehole Drilling Machine

200 Meters Borehole Drilling Machine Crawler Mounted For Deep Underground Water

200 Meters Borehole Drilling Machine Crawler Mounted For Deep Underground Water

200 Meters Borehole Drilling Machine Crawler Mounted For Deep Underground Water
200 Meters Borehole Drilling Machine Crawler Mounted For Deep Underground Water
200 Meters Borehole Drilling Machine Crawler Mounted For Deep Underground Water
Product Details:
Place of Origin: China
Brand Name: ShiTan
Certification: ISO
Model Number: ST200
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: USD 15000 /set
Packaging Details: 1*20 FCL
Delivery Time: 5 days after advance payment
Payment Terms: T/T, Western Union
Supply Ability: 2000sets/month
Contact Now
Detailed Product Description
Drilling Rig Product Name: ST 200 Borehole Drilling Rig Machine Drilling Type: Multifunction
Mobility: Crawler Drilling Unit: Tophammer
Feeding Type: Hydraulic Drilling Diameter: 140-200mm
Drill Rod Diameter: 76/89 Swing Speed: 45-70rpm
Swing Torque: 3500-4800N.M Drill Rod Length: 1.5m 2.0m 3.0m
Drilling Depth: 200 Meters OEM: Available
High Light:

200 meters deep borehole drilling machine

,

crawler mounted borehole drilling machine

,

200m deep water borehole drilling machine

200 Meters Crawler Mounted Durable Fast Speed Deep Water Borehole Drilling Rig Machine

 

 

ST 200 Borehole Drilling Rig Description:

 

The pneumatic dth drilling rig mainly drilling rock must connect with air compressor . it has fast drilling speed ,pneumatic dth drilling rig can drill 20-40m per hour . high drilling effective .the engine it is 63kw ,more powerful .pneumatic water borehole drilling rig it has 4 high hydraulic leg which can lifting 1.6m height can easy loading on the truck .

 

ST 200 Borehole Drilling Rig Parameters:

 

Drilling Rig Model ST-200
Weight 5.8T
Bore diameter 140-305mm
Drilling depth 200m
Stroke 3.4m
Travelling speed 2.5km/h
Gradeability 30%
Power 65-70KW
Rated pressure 1.7-3.0mpa
Air consumption 17-30m³/min
Drill rod diameter Φ76, Φ89
Drill rod length 1.5m 2.0m 3.0m
Elevating capacity 15T
Swing speed 45-70rpm
Swing torque 3500-4800N.M
Dimensions

4000*1750*2450mm

 

 

ST 200 Borehole Drilling Rig  Advantages:

 

1.compact design for easy use
2.160meters drilling and 30m/h drilling speed
3.Track all terrain chassis ,durable and stable .
4.Double hydraulic power head more powerful ,the drill speed faster and drill diameter more big .
5.High power engine and integrated operation.

 

ST 200 Borehole Drilling Rig Service:

 

Before sales: Engineering Consultance Service & Technical Support;
After sales: Process clients' feedback and or problems during the operation of the machines within 24 hours;
OEM service: We accept OEM orders and 70 percent of our clients are enjoying OEM services;

 

What should we pay attention to in hydro power projects?

 

1. The safety of the water well drilling rig must be checked. All parts must be complete without leakage of cables, drill pipes, drill bits, etc.

2. The drill should be loaded firmly, turn or bend the road, fix the steel wire and fix it;

3. When entering the construction site, the drilling rig should be fixed, the drilling area should be larger than the water well drilling rig, and there should be enough safety space around;

4. When drilling, the drilling position, direction, angle and depth must be strictly followed, and the drill bit must not be modified without authorization;

5. When installing the drill pipe, check the drill pipe to ensure that the drill pipe is not blocked, bent, and the steel wire is not worn. It is strictly forbidden to unqualified the drill pipe;

6. When loading and unloading the drill bit, strictly prevent the pipe clamp from clamping the cemented carbide parts, and it is strictly prohibited to prevent the flat drill bit and core pipe.

 

200 Meters Borehole Drilling Machine Crawler Mounted For Deep Underground Water 0

200 Meters Borehole Drilling Machine Crawler Mounted For Deep Underground Water 1

200 Meters Borehole Drilling Machine Crawler Mounted For Deep Underground Water 2200 Meters Borehole Drilling Machine Crawler Mounted For Deep Underground Water 3

 

 

 

 

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: cathy

Tel: 13343314303

Send your inquiry directly to us
Jinzhou City Shitan Machinery Equipment CO. LTD.
Xiaoshang Village,Jinzhou City,Hebei province,China
Tel:86--15511892512
Mobile Site Privacy Policy | China Good Quality Water Well Drilling Rig Machine Supplier. © 2020 - 2024 drillingrigmachines.com. All Rights Reserved.