Send Message
Tel:
Jinzhou City Shitan Machinery Equipment  CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Home ProductsSoil Testing Drilling Rig

Outdoor Borehole Exploration Soil Testing Drill Rigs Equipment 200 Meters

Outdoor Borehole Exploration Soil Testing Drill Rigs Equipment 200 Meters

  • Outdoor Borehole Exploration Soil Testing Drill Rigs Equipment 200 Meters
  • Outdoor Borehole Exploration Soil Testing Drill Rigs Equipment 200 Meters
Outdoor Borehole Exploration Soil Testing Drill Rigs Equipment 200 Meters
Product Details:
Place of Origin: China
Brand Name: ShiTan
Certification: ISO9001
Model Number: GK-200
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: USD4500-5800/SET
Packaging Details: wooden box
Delivery Time: Within 7-12 days
Payment Terms: T/T, Western Union
Supply Ability: 20000 sets per year
Contact Now
Detailed Product Description
Name: Soil Testing Drilling Rig Power Type: Diesel
Voltage: 220v Dimension(L*W*H): 1730*860*1360
Application: Water Well,railways, Core Type: Small Core Drill Rig
Max Drilling Depth: 200 Meter Drilling Diameter: 300 Mm
Condition: New Color: Customized
Warranty: 24 Months OEM: Acceptable
High Light:

borehole exploration soil testing drill rigs

,

200 meters soil testing drill rigs

,

200 meters soil testing drilling rig

Outdoor Borehole Exploration Soil Testing Drilling Rig Equipment 200 Meters

 

 

GK 200 Soil Testing Drilling Rig Description

 

GK200 is a lightweight shallow hole rig which can be drilling depth max 200M,diamter 75-300mm,with oil pressure feed.

Mainly used for geological general investigation and exploration,road and tall buliding foundation exploration

 

GK 200 Soil Testing Drilling Rig Tech Data

 

GK 200 Soil Testing Drilling Rig
Drilling diameter(mm) 75-300mm
Drilling depth (m) 200-30m
Drill pipe diameter (mm) 42,50
Drilling angle(°) 90~75
Equipment size(L * B * H) 1730 * 860 * 1360 (mm)
Rig weight (except engine) 700
Mobile device
Moving length 350mm
Leave distance 300mm
Gyrator
Spindle speed (four gear) (r/min) 115,230,505,1010
Spindle travel(mm) 450
Spindle no-load lifting maximum moving speed(m/s) 0.05
Spindle no load drop maximum movement speed(m/s) 0.067
Spindle maximum feed pressure(KN) 15
Spindle maximum lifting force(KN) 25
Spindle maximum output torque(KN• m) 1.5
Winch assembly
Winch maximum lifting force (single rope) 20
Reel speed (r/min) 20,39,85,170
Reel circumferential speed(m/s) 0.172,0.345,0.738,1.476
Reel diameter(mm) 140
Wire rope diameter(mm) 9.3
Wire rope density (m) 40
Brake diameter(mm) 278
Brake band width (mm) 50
Oil pump
Oil pump type YBC -20/125
Nominal pressure (Mpa) 12.5
Rated flow(ml/r) 20
Rated speed(r/min) 800-2500
Diesel engine or motor
Diesel engine 1115
Rated power (KW) 16.2
Rated speed (r/min) 2200
Rated pressure(Mpa) 12.5
Motor type Y160M - 4
Rated power (KW) 11
Rated speed (r/min) 146

 

GK 200 Soil Testing Drilling Machine Advantages

 

1. Adopt Low speed high torque hydraulic motor drive rotary device output torque
2. The advantage of cylinder is promoting more stable, less failure significantly than the motor propulsion.
3. Equip two filter effectively to ensure the safety of diesel engine intake and prolong engine life.
4. It can readily monitor rig hydraulic system pressure and boost pressure to ensure the rig stable and efficient operation.
5.Using well-known brands of multi-way control valve, superior performance, handle centralized, easy to operate

 

Why is the the drilling rig not suitable for use in rainy days?

 

After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large drawdown pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain superelevation, and the frozen soil in the backfill in winter shall not exceed 15%.

 

Outdoor Borehole Exploration Soil Testing Drill Rigs Equipment 200 Meters 0

 

Outdoor Borehole Exploration Soil Testing Drill Rigs Equipment 200 Meters 1Outdoor Borehole Exploration Soil Testing Drill Rigs Equipment 200 Meters 2

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: cathy

Tel: 13343314303

Send your inquiry directly to us
Jinzhou City Shitan Machinery Equipment CO. LTD.
Xiaoshang Village,Jinzhou City,Hebei province,China
Tel:86--15511892512
Mobile Site Privacy Policy | China Good Quality Water Well Drilling Rig Machine Supplier. © 2020 - 2024 drillingrigmachines.com. All Rights Reserved.