Place of Origin: | China |
Brand Name: | ShiTan |
Certification: | ISO9001 |
Model Number: | GK-200 |
Minimum Order Quantity: | Negotiation |
---|---|
Price: | Negotiation |
Packaging Details: | standrad export package |
Delivery Time: | Within 7-12 days |
Payment Terms: | T/T, Western Union |
Supply Ability: | 1000 sets per month |
Product Name: | GK 200 Mobile Mining Exploration Drilling Rig,Soil Testing Drilling Rig | Power Type: | Diesel Or Motor |
---|---|---|---|
Voltage: | 380V,220V | Dimension(L*W*H): | 1730*860*1360 |
Usage: | Water Well,railways, Core | Color: | Customer Required |
Drilling Depth: | 200 Meters | OEM: | Available |
Warranty: | 24 Months | Weight: | 600kg |
Feature: | High Drilling Efficiency | ||
Highlight: | diesel power soil testing drilling rig,380v soil testing drilling rig,380v exploration drill rig |
Shitan Machinery GK 200 Mobile Mining Exploration Drilling Rig,Soil Testing Drilling Rig
GK 200 Soil Testing Drilling Rig Introduction
Designed with hydro-chucking unit instead of slips to ensure drilling from stop when changing pipes.
Close levers, convenient to operate, safe and reliable operations.
GK 200 Drilling Rig Technical Data
GK200 parameter | |
Drilling depth | 200m |
Drilling caliber | 200mm |
Drill rod caliber | 50mm |
Drilling angle | 90°~75 ° |
Drill weight (No include power) | 510kg |
Spindle | |
Spindle speed | 64 128 287 557 r/min |
Spindle stroke | 450mm |
Hoist | |
Max.single line hoisting capacity | 2400kg |
Reel lifting speed | 0.41 0.82 1.64m/s |
Tightrope caliber | 12.5mm |
Tightrope cubic measure | 35mm |
Hug floodgate caliber | 260mm |
Hug floodgate belt width | 70mm |
Distance between drill and hole | 450mm |
Mud pump | |
Type | Horizontal single urn twin action |
Displacement | 170L/mim |
Power | |
Diesel engine | S1115 15HP |
Electric motor | Y160M-4 11kw 1440r/min |
Maximum pressure | 3Mpa |
Work pressure | 1.5Mpa |
Water inlet caliber | 40mm |
Water to exit caliber | 30mm |
Triangle conveyer belt | B1728mm |
GK 200 Drilling Rig Features
Compact in structure. All the drill, water pump and diesel engine installed on one base frame result in space-saving.
Light in weight, easy disassembling for transportation and applicable to working conditions in plain and mountain areas
a. During component disassembly, the locating pin shall be removed first and then other disassembly work shall be carried out. During installation, the locating pin shall be installed first after the position is aligned, and then other parts shall be installed.
b. Protect the joint when removing the oil pipeline.
c. The disassembly times of oil pipeline joints shall be minimized to avoid oil leakage.
d. During disassembly and installation, it is forbidden to strike the casting with force. When it is necessary to strike other accessories, wooden blocks or red copper blocks shall be padded
e. Before installation, the parts shall be cleaned with kerosene and coated with sufficient lubricating oil (or grease). The powder metallurgy shaft sleeve shall be carried out according to the provisions in the section of "use and maintenance".
f. Replace damaged or worn parts
g. When installing the diesel engine, pay attention to check the coaxiality of the crankshaft and the worm.
Contact Person: cathy
Tel: +8613315955856