Place of Origin: | Hebei ,China |
Brand Name: | ST |
Certification: | ISO 9001 |
Model Number: | ST-180 |
Minimum Order Quantity: | 1set |
---|---|
Price: | Negotiable |
Packaging Details: | Wooden Package |
Delivery Time: | 5 days |
Payment Terms: | T/T, Western Union, |
Supply Ability: | 2000 sets/month |
Product Name: | ST 180 Meters Customized Borewell Machine Crawler Mounted Drilling Rig Equipment | Weight: | 4.5T |
---|---|---|---|
Drilling Depth: | 180m | Dimension(L*W*H): | 3800*1500*2200mm |
Drilling Hole Diameter: | 105-180mm | Walking Speed: | 2.5km/h |
Climbing Angles (Max.): | 30 | Equipped Capacitor: | 55KW |
Drill Pipe Diameter: | 76/89mm | Condition: | New |
High Light: | borewell crawler drilling rig,180m crawler drilling rig,180m crawler mounted drill rig |
Model | ST180 |
Drilling hole diameter | 140-254mm |
Drilling depth | 180m |
One-time advance length | 3.3m |
Walking speed | 2.5km/h |
Climbing angles (Max.) | 30 |
Equipped capacitor | 55kw |
Using air pressure | 1.7-2.5mpa |
Air consumption | 17-31m³/min |
Drill pipe length | 1.5m, 2.0m, 3.0m |
Drill pipe diameter | 76mm, 89mm |
Rig lifting force | 12t |
Swing speed | 45-65rpm |
Swing torque | 3200-4600(N.m) |
Dimension | 3800*1500*2200mm |
Weight | 4500kg |
1. The drilling rig hydraulic transmission of the rig effectively utilizes the power. This makes the overall power loss small and the drilling cost low.200m 300m 400m 500m 600m depth Truck crawler portable compressor DTH water well drilling rig
After starting the engine, run it at low speed for 3-5 minutes, and turn the power head under no-load, so as to facilitate the normal operation of the hydraulic system.
2. During the operation of the drilling rig, the operator shall often observe whether the indications of various instruments are normal, and stop in time for inspection in case of any abnormality.
3. During operation, special attention shall be paid to the operation control handle in place to avoid pressure impact on the system.
4. During use, check and fasten the pipe joints with pressure vibration and the fastening bolts of the oil pump to ensure that there is no oil and air leakage.
5. The drilling rig must be commanded by a specially assigned person when walking, and special attention shall be paid to dangerous sections such as high-voltage line and puddle.
6. No one is allowed to stand within the rotating range of the drilling rig.
7. After the drilling rig is transferred, the crawler must be extended immediately after getting off the flatbed truck.
8. When checking the hydraulic oil, wait until the hydraulic oil cools down.
Contact Person: cathy
Tel: 13343314303