Send Message
Tel:
Jinzhou City Shitan Machinery Equipment  CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Home ProductsSoil Testing Drilling Rig

Gold Mining GK 200 Customized Soil Testing Drilling Rig

Gold Mining GK 200 Customized Soil Testing Drilling Rig

  • Gold Mining GK 200 Customized Soil Testing Drilling Rig
  • Gold Mining GK 200 Customized Soil Testing Drilling Rig
Gold Mining GK 200 Customized Soil Testing Drilling Rig
Product Details:
Place of Origin: China
Brand Name: JINZHOU SHITAN
Certification: ISO9001
Model Number: GK 200
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiation
Packaging Details: Standard Export Package
Delivery Time: 3-5 days
Payment Terms: T/T, Western Union
Supply Ability: 5000 sets per year
Contact Now
Detailed Product Description
Product Name: Gold Mining Drilling Rig GK 200 Customized Soil Sample Testing Drilling Rig Drilling Depth: 200 Meters
Drilling Diameter: 75-275mm Condition: New
Type: Core Drilling Rig,water Well Drilling ,soil Testing Power Type: Electric
Voltage: 380V Warranty: 1 Year
Material: Steel OEM: Acceptable
Color: Optional Red,Yellow
High Light:

Gold Mining Soil Testing Drilling Rig

,

GK 200 Soil Testing Drilling Rig

,

Customized Soil Testing Drilling Rig

Gold Mining Drilling Rig GK 200 Customized Soil Sample Testing Drilling Rig

 

 

GK 200 Soil Testing Drilling Rig Product Information:

 

GK-200 Drilling Rig with hydraulic feeding is widely utilized and featured in high power and hoisting load(2T), large torque transmission, etc. The rotating speed of vertical hexagonal spindle varies between 71r/min-825r/min. 

 

GK 200 Soil Testing Drilling Rig Technical Data:

 

Drilling Rig
Drilling diameter(mm) 75,91,110,130,150,300
Drilling depth (m) 200,150,100,70,50,30
Drill pipe diameter (mm) 42,50
Drilling angle(°) 90~75
Equipment size(L * B * H) 1730 * 860 * 1360 (mm)
Rig weight (except engine) 700
Gyrator
Spindle speed (four gear) (r/min) 115,230,505,1010
Spindle travel(mm) 450
Spindle no-load lifting maximum moving speed(m/s) 0.05
Spindle no load drop maximum movement speed(m/s) 0.067
Spindle maximum feed pressure(KN) 15
Spindle maximum lifting force(KN) 25
Spindle maximum output torque(KN• m) 1.5
Winch assembly
Winch maximum lifting force (single rope) 20
Reel speed (r/min) 20,39,85,170
Reel circumferential speed(m/s) 0.172,0.345,0.738,1.476
Reel diameter(mm) 140
Wire rope diameter(mm) 9.3
Wire rope density (m) 40
Brake diameter(mm) 278
Brake band width (mm) 50
 
 


GK 200 Soil Testing Drilling Rig Features:

 

1. With hydraulic automaatic feeding device, elevated drilling efficiency.

2. Large torque and drilling diameter.

3. With a spherial jaw holding mechanism and the rod replacement without breakdwn, high efficiency.

4. Compact structure, small volume, lightweight, high detachability, easy transportation and suitable for the operations in plains or mountain areas.

5. Adoping large drive pipe, double guide rod, increase the stability.

 

GK 200 Soil Testing Drilling Rig  FAQ:

 

We Shitan Machinery is a professional drilling rig manufacture for years and we take quality and reputation as our life.

Q: How long is your delivery time?

A: Generally it is 10-20 days if the goods are in stock. or it is 20-30 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?A:Sorry, free sample is not available.

Q: What is your terms of payment ?A: Usually we accept T/T 30% in advance, then pay the 70% T/T before shipping.

Q:How to order?

A:Please send us your inquiry with detail item description or with Model number.

If there is no packing demand we take it as our regular exported standard packing.

We will offer you an order form for filling. We will recommend you the most suitable model according to information you offered.

After you send your detail requirement, we provide quotation to you.

Q:Can I expect a quality products?

A:All the production and processing are strictly according to international standard. At the same time, mature production technology ensuring the quality satisfy international request. We also welcome the third party inspection

 

GK 200 Drilling Rig Working Attentions

 

It needs to be shut down for a short time for simple maintenance after finishing the hole or before opening the hole. The first thing is to inject grease into several parts with high frequency of heavy load, such as the main winch bearing, lifting gear, main pulley, slewing support, mast luffing cylinder bearing, etc. the oil-water separator needs to be cleaned every day, and the bottom of the diesel tank needs to be cleaned every three days to check the wear of the drill bucket, If the wear is serious, repair welding can be done. Check the welding parts of drill pipe pin and drill pipe square head, check the connecting pin shaft and bolt of drill bucket hook and top cylinder, check the lock wire of bucket bottom rotary shaft, and lightly apply grease on mast slide and main coil steel wire rope

 

Gold Mining GK 200 Customized Soil Testing Drilling Rig 0Gold Mining GK 200 Customized Soil Testing Drilling Rig 1Gold Mining GK 200 Customized Soil Testing Drilling Rig 2Gold Mining GK 200 Customized Soil Testing Drilling Rig 3

 

 

 

 

 

 

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: cathy

Tel: 13343314303

Send your inquiry directly to us
Jinzhou City Shitan Machinery Equipment CO. LTD.
Xiaoshang Village,Jinzhou City,Hebei province,China
Tel:86--15511892512
Mobile Site Privacy Policy | China Good Quality Water Well Drilling Rig Machine Supplier. © 2020 - 2024 drillingrigmachines.com. All Rights Reserved.