Place of Origin: | hebei,china |
Brand Name: | shitan |
Certification: | ISO |
Model Number: | GK200 |
Minimum Order Quantity: | 1set |
---|---|
Packaging Details: | Wooden box |
Delivery Time: | 5-7days |
Payment Terms: | T/T, L/C, Western Union |
Supply Ability: | 100/day |
Drilling Depth: | 200m | Condition: | New |
---|---|---|---|
Power Type:: | Diesel | ||
High Light: | 3000kg Crawler Track Undercarriage,Sampling Crawler Track Undercarriage,ISO rubber track undercarriage |
Crawler Base Civil Engineering Core Sampling and Water Well Borehole Drilling Machine
Crawler Track Undercarriage Product Description
The chassis comes with four high-strength threaded legs(or Hydraulic high leg)the threaded legs install rate and adjust is fast and convenient, can be used for work plane leveling.It can make loading and unloading reduce the cost of to improve efficiency.It also can be used as auxiliary support when the track drilling rig is working. ·using 48V electric starting diesel engine is reduced the operate's labour intensity greatly.Especially in cold season,when diesel engine start hardly,it will show superiority vastly. ·the machine is equipped with BW-160 independent mud pump,the pump flow and pressure are big,the maintenance is convenient,the parts of the machine are convenient to buy all over the country.
Crawler Track Undercarriage parameter
GK200 crawler hydraulic core drilling rig
|
|
Drilling depth
|
200m
|
Maximum opening diameter
|
75-300mm
|
Final hole diameter
|
75mm
|
Kelly
|
53/59*4200mm
|
Drill pipe diameter
|
50/60mm
|
Drilling angle
|
90°-75°
|
Auxiliary power diesel engine
|
16.2kw 2200r/min
|
Structural weight/Size
|
3000kg 3800*1950*2700
|
Spindle
|
|
Spindle speed
|
64/128/287/557r/min
|
Spindle stroke
|
450mm
|
Windlass
|
|
Single rope lifting force
|
24kn
|
Single rope lifting speed
|
0.12/0.22/0.49/0.95m/s
|
Drum diameter
|
140mm
|
Wire rope diameter
|
13mm
|
Wire rope capacity
|
35m
|
Derrick
|
|
Rated load
|
5t
|
Effective height
|
6m
|
Tower leg specification
|
89mm
|
How to maintain a fully hydraulic water well drilling rig in winter
1. cleaning and maintenance:
The main parts for cleaning and maintenance of full hydraulic water well drilling rig in winter are the appearance of chassis and working device. Descaling and decontamination shall be carried out to keep the appearance of construction machinery clean and tidy. Meanwhile, attention shall be paid to whether the devices and components are damaged and whether the leakage parts are worn during the cleaning process, so as to make early preparations for the next maintenance.
2. replace gear oil and add lubricating grease:
The weather is dry in winter, especially the geological conditions of the construction site are complex, so it is more necessary to replace the gear oil of the full hydraulic water well drilling rig and add lubricant in time. While adding lubricant, check the wear condition, replace it in time, and clean the interior.
3. check the hydraulic system for leakage:
For most full hydraulic water well drilling rigs and anchor drilling rigs, the hydraulic system is used as the main component, and the role of the hydraulic system is extremely important. The temperature is particularly low in winter, and the seals of the hydraulic system of construction machinery will expand and contract, which is easy to cause leakage, and often has a certain impact on the normal operation of the hydraulic system. In order to avoid the leakage fault of the hydraulic system, the seals of the hydraulic system should be systematically inspected before entering the severe winter, and the seals at the leakage parts should be replaced in time.
Contact Person: Anna
Tel: 15511892512