Place of Origin: | China |
Brand Name: | ShiTan |
Certification: | ISO9001 |
Model Number: | XY-3 |
Minimum Order Quantity: | Negotiation |
---|---|
Price: | Negotiation |
Delivery Time: | Within 7-12 days |
Payment Terms: | L/C, D/A, T/T, Western Union |
Type: | Hydraulic Crawler Drilling Rig | Color: | Red Yellow |
---|---|---|---|
Feature: | High Drilling Efficiency | Usage: | Water Well |
Application: | Soil Sampling | Drilling Diameter: | 75-300mm |
High Light: | Hydraulic Rotary Drilling Rig,600M Rotary Drilling Rig,1600kg coal drilling machine |
High Speed Crawler Mounted Drill Rig Small Size For Building Exploration
hydraulic crawler drilling rig is l is suitable for use in water well drilling, the exploration, geophysical exploration, road and building exploration and blasting hole drilling engineering, etc. It can be selected acording to the underlying different alloy, diamond,compact drill for drilling,etc.
Level 3,2-9 drilling, sandy clay and rock formations ,etc.
XY-3 Crawler Mounted Drill Rig Parameter
Drilling depth | 600m |
Max open hole caliber | 300mm |
End hole caliber | 75mm |
Drilling Rod diameter | 60mm |
Drilling angle | 90°~65° |
Dimension | 2500 x 900 x 1800mm |
Drill weight (without power) | 1600kg |
Spindle | |
spindle speed | Forward 30-1050r/min |
Reverse 29 137r/min | |
Spindle stroke | 600mm |
Spindle inner diameter | 96mm |
Lifting capacity | 6000kg |
Hoist | |
Max.Single line lifting capacity | 4000kg |
Max.Single line lifting speed | 0.5-1.9m/s |
Wirerope caliber | 12.5mm |
Wirerope length | 50m |
Reel diameter | 300mm |
Hug folldgate belt width | 90mm |
Mud pump | |
Type | BW-250 |
Displacement | 250 L/min |
Work pressure | 80kg/cm² |
Water inlet pipe diameter | 75 mm |
Water outlet pipe diameter | 50 mm |
Gear Oil pump | |
Front Displacement, pressure | 63 L/min 20Mpa |
Behind Displacement, pressure | 25 L/min 20Mpa |
Matters Needing Attention in Drilling Process Of Crawler Drilling Rig
1. After drilling structure of crawler drill bit, the center drilling tool needs to be replaced in time. Firstly, the hole bottom needs to be cleaned, and then the residue at the bottom of the hole is blown clean. After the bit stops rotating, the drilling tool in the drilling rig is slowly lifted up. When the lifting force is good enough to lift the drilling tool, it is appropriate.
2. When the drill bit of crawler drilling rig is summarized in the drilling process, it is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and timely keep the hole clean when necessary, and the drill bit in the drilling rig is not allowed to pull out forcefully during the drilling process.
3. Sometimes more residual rock slag will be left at the bottom of the hole of crawler drilling rig, and the rotary part of the eccentric bit will be blocked by the rock slag, which will affect its closing production. At this time, it is necessary to transport compressed air, clean the hole again, and make the DTH hammer work for a short time, and then lift the central drilling tool again.
Contact Person: cathy
Tel: 13343314303