Tel:
Jinzhou City Shitan Machinery Equipment  CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Home ProductsCrawler Mounted Drill Rig

XY-3 530 Meter Water Well Borehole Drilling Rig

XY-3 530 Meter Water Well Borehole Drilling Rig

  • XY-3 530 Meter Water Well Borehole Drilling Rig
  • XY-3 530 Meter Water Well Borehole Drilling Rig
XY-3 530 Meter Water Well Borehole Drilling Rig
Product Details:
Place of Origin: China
Brand Name: ShiTan
Certification: ISO9001
Model Number: XY-3
Payment & Shipping Terms:
Minimum Order Quantity: Negotiation
Price: Negotiation
Packaging Details: Standard export transportation package
Delivery Time: Within 7-12 days
Payment Terms: L/C, D/A, T/T, Western Union
Supply Ability: 2000Set/Year
Contact Now
Detailed Product Description
Model: XY-3 Name: DTH Drilling Rig
Power(W): 11KW Usage: Coal
Weight: 500 Kgs Rotating Speed: 0-93 Rpm
Working Pressure: 0.5-0.7 MPa Lifting Force: 9600 N
High Light:

Water Well Borehole Drilling Rig

,

XY3 Borehole Drilling Rig

,

530Meter borehole drilling machine

XY-3 Crawler Mounted DTH Drilling Rig / Water Well Borehole Drilling Rig

 

 

XY-3 Crawler Mounted Drilling Rig Knowledge

 

1, the clutch is in the state, the belt does not rotate in front
Rigs 2 and 200 have no reversal or reversal
3, drilling rig can be decided angle straight and inclined type tower played the best selection of high speed soil 75~90.
4, the earth under the active drill pipe with variable diameter plus three wing bit
A rock drill rod diameter variable connecting head connected with the active hole pipe is connected with the drill rod, to a certain depth in the head, above 2m depth hole pipe into the core tube, 60 meters deep need for powder tube.

5, the diameter becomes bit.
6, to speed up, need to speed reducer belt rotation, drilling speed faster, but the endurance of drilling rig is low.
7, work efficiency: complete soil layer, hit 60 meters a day. General strata 16, 7 meters.
8, hydraulic oil with 32 oil, cold place with No. 42
9. Connection of wire rope and lifting device. The elevator is hung on the rope for pulling the drill pipe / active drill pipe, length of wire rope by derrick decided.
10, the coal mine roadway drilling rigs are available, without.

 

XY-3 Crawler Mounted Drilling Rig Parameters

 

Drill hole depth 530m
The hole diameter 75-530mm
Hole diameter 300mm
Final hole diameter 75mm
Pipe f60
Borehole inclination 90°--65°
Vertical shaft
Vertical shaft forward speed 32-1057r/min
Vertical inversion speed 29-137r/min
Vertical stroke 600mm
Vertical inner hole diameter 96mm
Vertical shaft hoisting capacity 60KN
Primeary winding
Single rope winding speed 0.5-1.9m/s
Diameter of wire rope 12.5mm
Single rope hoisting capacity 30KN
Drum diameter 300mm
Drum capacity 65m
Mud pump(optional)
Horizontal triplex BW-250 type of mub pump BW-250 mud pump
Displacement 250L/min
Pressure of work 80kgcm2
The inlet pipe diameter 76mm
Outlet pipe diameter 51mm
The gear pump
Duplex gear oil pump CBF-F63/25
Before the traffic pressure 63L/min 20Mpa
After the traffic pressure 25L/min 20Mpa
Drilling rig power
The diesel engine YN27/39kw/2400rpm
motor Y180L-4/22kw
Weight and size
Rig weight 3600kg
Overrall diamensions 3500*1900*2600mm

 

Main features of xy-3 core drill


1. Lg140 speed regulation assembly and 10 speed ranges of automobile are adopted;
2. Large torque, strong bearing capacity, remote control and speed change can be realized, and the operation is centralized and convenient;
3. It has high installed power and 2-gear reverse speed, which is easy to deal with accidents;
4. With normally closed hydraulic chuck, easy to operate;
5. Independent operation of vertical shaft and winch can be realized;
6. The diameter of vertical shaft through hole is large, so it can be replaced by large hexagonal driving drill pipe.

 

XY-3 530 Meter Water Well Borehole Drilling Rig 0XY-3 530 Meter Water Well Borehole Drilling Rig 1

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: cathy

Tel: 13343314303

Send your inquiry directly to us
Jinzhou City Shitan Machinery Equipment CO. LTD.
Xiaoshang Village,Jinzhou City,Hebei province,China
Tel:86--15511892512
Mobile Site Privacy Policy | China Good Quality Water Well Drilling Rig Machine Supplier. © 2020 - 2022 drillingrigmachines.com. All Rights Reserved.