Place of Origin: | China |
Brand Name: | JINZHOU SHITAN |
Certification: | ISO |
Model Number: | BW320 |
Minimum Order Quantity: | 1 set |
---|---|
Price: | Negotiation |
Packaging Details: | Standard Export Package |
Delivery Time: | 7-12 days |
Payment Terms: | L/C, D/A, D/P, T/T |
Supply Ability: | 2000 sets per year |
Model Number: | BW320 | Structure: | Piston Pump |
---|---|---|---|
Usage: | Drill Mud Pump | Application: | Heavy Duty Slurry Pump |
Power: | Electric, 30Kw | Fuel: | Electric |
Pressure: | High Pressure | Standard Or Nonstandard: | Standard |
Theory: | Reciprocating Pump | Pump Type: | Small Mud Sucking Pump |
Highlight: | portable mud pump,reciprocating mud pump |
BW320 Flow Speed Drilling Rig Mud Pump
Drilling Rig Mud Pump Description:
BW 320 mud pump is a kind of portable mud pump. The pump is a horizontal three cylinder reciprocating single acting piston pump, has four types of flow and four types of pressure. The pump has the advantages of small volume, light weight, long service life, simple operation, reliable and flexible, general and standard parts and other characteristics, light and flexible, easy to move. It can be used in railway, water, metallurgy, construction, geological industry deep hole 1000m geological exploration, engineering exploration with pump.
Drilling Rig Mud Pump Parameter:
Model | BW320 Drilling Rig Mud Pump |
Type | Horizontal triplex single acting reciprocating piston pump |
Stroke (mm) | 1100 |
Cylinder diameter (mm) | 80 |
Pump speed (times/min) | 214 153 109 78 |
Flow (l/min) | 320 230 165 118 |
Pressure (Mpa) | 2.2 3.6 6.2 10 |
Power (Kw) | 30 |
Shape size (mm) | 1905*1100*1200 |
Weight (kg) | 720 |
Precautions for Drilling Rig Mud Pum
(1) Always pay attention to the indication of pressure gauge. If the indication of pressure gauge or the safety device does not work after exceeding the pressure, find out the reason and clear the fault Restart.
(2) Pay attention to whether the structure of the mortar pump and motor is normal. When any fault is found, stop the pump immediately and open the discharge valve to reduce the pressure and eliminate the fault.
(3) Attention should be paid to make the gland press the packing to avoid leakage. If there is still leakage after pressing, the packing or piston should be replaced according to the specific situation.
(4) The consistency of the mixed mortar shall be measured before entering the pump. During the test, the consistency meter shall be vertical to the slurry surface, and it shall be laid down easily to sink with its own weight.
(5) At the end of each shift, clean water must be pumped immediately, and the pipeline and pump interior must be cleaned until the ball valve, discharge port, suction port and discharge port are ensured The valve is clean and smooth.
(6) The upper chamber should be filled with oil.
Contact Person: Anna
Tel: +8615511892512