Place of Origin: | China |
Brand Name: | ShiTan |
Certification: | ISO9001 |
Model Number: | BW200 |
Minimum Order Quantity: | Negotiation |
---|---|
Price: | Negotiation |
Packaging Details: | Standard export transportation package |
Delivery Time: | Within 7-12 days |
Payment Terms: | L/C, D/A, T/T, Western Union |
Supply Ability: | 20000Set/Year |
Model Number: | Bw 200 Mud Pump | Type: | Gear Pump |
---|---|---|---|
Structure: | Piston Pump | Application: | Sewage |
Pressure: | Low Pressure | Usage: | Oil |
Fuel: | Diesel | ||
Highlight: | Diesel Drilling Rig Mud Pump,BW200 Drilling Rig Mud Pump,Water Well Drilling Mud Pump |
BW 200 Diesel Water Well Drilling Rig Mud Pump
Drilling Rig Mud Pump Introduction
Model BW-200 mud pump is a kind of portable mud pump. The pump is a horizontal single cylinder double-acting pump.
1, Compact structure, light weight, small volume, beautiful appearance.
2, The design on the use of new ideas, new structure, new materials, new technology;
3, Loss of long life, high reliability
Drilling Rig Mud Pump Technology Parameters
Type | Horizontal type single-cylinder Double-action pump |
Cylinder Diameter | 80/65 mm |
Stroke | 85 mm |
Reciprocate Times | 145 times/ minute |
Displacement | 200 L/min |
Pressure | 4-6 MPa |
Volume Effiency | 80% |
Transmisiion shaft speed | 530 rotations/min |
Drive power | 20HP |
Input pipe diameter | 65mm |
Output pipe diameter | 37mm |
Mass (including the engine) | 300 kg |
Dimensions | 1050*630*820 mm |
Precautions Of Drilling Rig Mud Pump
(1) Always pay attention to the indication of pressure gauge. If the indication of pressure gauge or the safety device does not work after exceeding the pressure, find out the reason and clear the fault
Restart.
(2) Pay attention to whether the structure of the mortar pump and motor is normal. When any fault is found, stop the pump immediately and open the discharge valve to reduce the pressure and eliminate the fault.
(3) Attention should be paid to make the gland press the packing to avoid leakage. If there is still leakage after pressing, the packing or piston should be replaced according to the specific situation.
(4) The consistency of the mixed mortar shall be measured before entering the pump. During the test, the consistency meter shall be vertical to the slurry surface, and it shall be laid down easily to sink with its own weight.
(5) At the end of each shift, clean water must be pumped immediately, and the pipeline and pump interior must be cleaned until the ball valve, discharge port, suction port and discharge port are ensured
The valve is clean and smooth.
(6) The upper chamber should be filled with oil.
Contact Person: Anna
Tel: +8615511892512