Send Message
Tel:
Jinzhou City Shitan Machinery Equipment  CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Home ProductsPneumatic Borewell Machine

MultiFunction 140mm 300 Meter Pneumatic Crawler Drill

MultiFunction 140mm 300 Meter Pneumatic Crawler Drill

  • MultiFunction 140mm 300 Meter Pneumatic Crawler Drill
MultiFunction 140mm 300 Meter Pneumatic Crawler Drill
Product Details:
Place of Origin: China
Brand Name: ShiTan
Certification: ISO
Model Number: ST200
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: USD46000/set
Packaging Details: no packing
Delivery Time: 5 days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 2000sets/month
Contact Now
Detailed Product Description
Features: Very Powerful At Soil, Sand, Hard Rock, Etc. Land Condition. Drilling Type: Multi-function
Mobility: Crawler Drilling Unit: Tophammer
Feeding Type: Hydraulic Drilling Diameter: 140-200mm
Application: Survey And Prospecting, Geophysical Exploration, Roads And Buildings And Other Exploration And Play Blasthole Drilling Bits Projects
High Light:

300Meter pneumatic crawler drill

,

140mm pneumatic crawler drill

,

MultiFunction Pneumatic Drill Rig

ST 300 Crawler Type Small Water Well Drilling Rig 300 Meter Pneumatic Drill Rig

 

 

ST300 crawler type pneumatic drilling rig

 

1. The range of application of ST300 crawler type gas drilling rig

Applicable to civil engineering drilling, geothermal drilling, drilling with large diameter and deep drilling footage, fast, flexible and efficient.

 

2. The technical parameter of ST300 crawler type gas drilling rig

 

model ST 300
Gross weight T 8.8
Dimension mm 4350*1850*2750
Aperture mm 140-325
Drilling depth m 300
Feed stroke mm 6000
Travel speed km/h 2
Grade ability Max. 30°
Rising height from ground mm 230
Wind pressure Mpa 1.7-3.3
Air consumption m³/min 23
Engine power kw 85
Rotary speed rpm 55-115
Rotation torque N.m 7200-8500

 

How the drilling machine works and matters needing attention in the construction process

 

  • 1. According to the water yield requirements of the well, the depth and diameter of the well are designed, and the drilling machine and corresponding auxiliary equipment are selected according to the formation conditions.
  • 2. Before drilling, machine platform leveling, equipment layout, equipment storage, tower erection and drilling rig placement shall be done well.
  • 3. Drilling in the loose formation, using percussive drilling machine water pressure step by step reaming construction technology.
  • 4. Rotary core drilling is used to drill holes in bedrock aquifer.
  • 5. In the process of drilling, the description should be made according to the technical requirements, and the layered soil samples, water samples and temperature measurement should be taken. The quality and quantity of sampling should be guaranteed.
  • There are seven points for attention in the construction process of drilling machine
  • 1. The operators of water well drilling rig shall be trained and qualified and take up the post with certificate.
  • 2. The equipment entering the site shall meet the construction requirements, and the trial operation test shall be conducted before the formal start-up of the well drilling rig, and the operation status shall be stated in time.
  • 3. The specific drilling process should be prepared, the operation rules and standards of water well drilling equipment should be prepared, and the construction records should be made.
  • 4. During the drilling process, it is not allowed to rotate until the planned elevation is reached. Maybe if the drill pipe needs to be rotated or raised under special circumstances, the drill pipe should be lifted to the surface, and the bit valve should be dredged and closed from the beginning. The operator should strictly control the descent speed and rotation speed of the threaded bit.
  • 5. Before drilling, carefully check whether the air hole at the top of the core pipe is smooth, whether the concrete delivery hose joint is outstanding, and whether there is distorted appearance.
  • 6. In the process of hole forming, when the drill pipe is found shaking or the footage is slow, the footage should be slowed down to avoid pile hole deflection, displacement and damage of drill pipe and drilling tool.

MultiFunction 140mm 300 Meter Pneumatic Crawler Drill 0

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Anna

Tel: 15511892512

Send your inquiry directly to us
Jinzhou City Shitan Machinery Equipment CO. LTD.
Xiaoshang Village,Jinzhou City,Hebei province,China
Tel:86--15511892512
Mobile Site Privacy Policy | China Good Quality Water Well Drilling Rig Machine Supplier. © 2020 - 2024 drillingrigmachines.com. All Rights Reserved.