Place of Origin: | China |
Brand Name: | JINZHOU SHITAN |
Certification: | ISO |
Model Number: | ST30 |
Minimum Order Quantity: | 1 set |
---|---|
Price: | Negotiation |
Packaging Details: | Standard Export Package |
Delivery Time: | 7-12 days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union |
Supply Ability: | 2000 sets per year |
Type: | Core Drilling Rig | Name: | Geological Core Drilling Rig |
---|---|---|---|
Warranty: | 95KG | Power Type: | Diesel |
Usage: | Water Well | Voltage: | Diesel Engine Driven |
Product Name: | Water Well Drilling Rig | Drilling Diameter: | 50-110mm |
High Light: | 2.6meters portable drilling rig,ISO portable drilling rig,Geological portable well drilling |
It is after years of market investigation and research! Its perfect shape, reasonable structure, simple and wide adaptability!
Power diversification: it can be powered by gasoline engines and diesel engines, and single phase and three-phase power can be used as power.
Adapt to a wide range: the area is less than 1 m³, and the height can be controlled at about 2.6 meters. So it can be used in the field and indoors.
Practicality is wide: it can be used to drill the hole with auger stem, sampled with the core tube and drilled well.
It is small, and weight about 100kg. It is easy to carry and construction in a narrow space. It is suitable for investigation and drilling.
Technical Parameters
Drill diameter (mm)
|
110(soil)
|
91
|
75
|
60
|
45
|
Drill depth(m)
|
5-10
|
10-15
|
15-20
|
20-25
|
30
|
Drill pipe diameter (mm)
|
30
|
||||
Output rotate(r/min)
|
200-570
|
||||
Torque
|
130N.m
|
||||
Gasoline engine
|
Model :1P75FA,power:4.5KW
rotate speed :2000-3600r/min |
||||
Dimension (mm)
|
500*1000*2780mm
|
||||
Weight(include the engine)
|
100kg
|
1.1 Rig Application:
1.1.1 The rig is suitable for survey and prospecting, geophysical exploration, roads and buildings and other exploration and play blasthole drilling bits projects.
1.1.2 Drilling bits can be chosen according to different strata .
1.2 Rig Features
1.2.1 hydraulic automatic feed mechanism, improve drilling efficiency, reduce manual labor workers.
1.2.2. Ball holding mechanism instead of using the chuck, can implement non-stop down the lever, easy to operate, safe and reliable.
1.2.3. With bottom hole pressure gauge indicates the pressure, easy to grasp hole situation.
1.2.4 The handle centralized, easy to operate.
1.2.5. Light weight, decomposition and strong, easy to move, adapted to the plains or mountain areas.
The water well drilling rig is maintained at different times
The maintenance of water well drilling rig is very important, which can prolong the service life of the equipment, keep the water well drilling rig in a good operation state for a long time, reduce the maintenance cost and ensure the personal safety of operators.
1. Monthly maintenance:
Thoroughly carry out the items required by shift and weekly maintenance.
Remove the chuck and clean the slip and slip seat. Replace in time if damaged.
Clean the filter in the oil tank and replace the deteriorated or dirty hydraulic oil.
Check the main parts and components. If damaged, replace them in time. Do not work with injuries. Completely eliminate the faults occurred in this month.
If the well drilling equipment is not used for a long time, all exposed parts (especially the surface of the processing surface) shall be coated with grease.
2. Weekly maintenance:
Thoroughly carry out the items required by shift maintenance.
Remove the dirt and soil on the tooth surface of chuck and slip.
Clean the oil and mud on the inner surface of the holding brake.
Eliminate faults that occur within this week.
3. Shift Maintenance:
Check whether all exposed bolts, nuts and safety pins are firm and reliable.
Eliminate other faults in the shift.
Check the oil leakage everywhere and deal with it as appropriate.
Check the oil level of transmission, transfer case and hydraulic system oil tank.
Add lubricating oil or grease according to the lubrication requirements.
Wipe the external surface of the well drilling rig equipment, and pay attention to the cleanness and good lubrication of the surface of the well drilling rig base, slide-way, vertical shaft and so on.
Contact Person: Anna
Tel: 15511892512