Send Message
Tel:
Jinzhou City Shitan Machinery Equipment  CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Home News

The five main points of maintenance for tracked drilling rigs

I'm Online Chat Now
Certification
China Jinzhou City Shitan Machinery Equipment  CO. LTD. certification
Customer Reviews
Im a dealer from Malaysia, we bought a GK200 Water Well Drilling Rig 2 years before, good quality, costly price!

—— David

The ST300 geological drilling rig we have purchased was maintenanced very well before delivery.

—— Mr Mustafa

We have purchased two Units of drilling rigs from Jinzhou Stone Mechinery Equipment CO. LTD. and works well till now.

—— Bruce

I have bought the Crawler Mounted Drill Rig over 3 years,they are still very good quality. Your products and service are excellent. we will increase more order next time!

—— Jaff

Company News
The five main points of maintenance for tracked drilling rigs
Latest company news about The five main points of maintenance for tracked drilling rigs

Hello everyone, today I will explain the five main precautions for maintaining tracked drilling rigs


Firstly, in addition to daily maintenance during construction, tracked drilling rigs must also regularly maintain important components according to requirements. The following 5 points need special attention:

 

1. Before each work, add lubricating grease to the elevator. When adding oil to the elevator, be sure to open the grease nozzle on the other end, which is beneficial for squeezing out the previously injected butter. Otherwise, it may damage the oil seal inside the elevator.

 

2. Check whether the oil level in each fuel tank is sufficient and whether the oil quality is normal. Check whether the oil level in each gearbox gear is sufficient and whether the oil quality is normal; Check for oil leakage faults.

 

3. Check if the steel wire rope has broken wires and if the connections are intact and safe.

 

4. Check if the elevator rotates flexibly and if the internal grease is contaminated.

 

5. Check for cracks, rust, desoldering, and other damages in the steel structure.
Have you all remembered the above 5 points?

 

We should promptly handle any faults found during use, eliminate all safety hazards, and ensure that the tracked drilling rig is always in optimal working condition.

 

latest company news about The five main points of maintenance for tracked drilling rigs  0

Pub Time : 2024-06-12 17:10:11 >> News list
Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Miss. Anna

Tel: +8615511892512

Send your inquiry directly to us
Jinzhou City Shitan Machinery Equipment CO. LTD.
Xiaoshang Village,Jinzhou City,Hebei province,China
Tel:86--15511892512
Mobile Site Privacy Policy | China Good Quality Water Well Drilling Rig Machine Supplier. © 2020 - 2024 drillingrigmachines.com. All Rights Reserved.