Send Message
Tel:
Jinzhou City Shitan Machinery Equipment  CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Home ProductsHydraulic Borewell Machine

295mm Hydraulic Borewell Machine Trailer Mounted Easy Mobile Gk 200

295mm Hydraulic Borewell Machine Trailer Mounted Easy Mobile Gk 200

  • 295mm Hydraulic Borewell Machine Trailer Mounted Easy Mobile Gk 200
  • 295mm Hydraulic Borewell Machine Trailer Mounted Easy Mobile Gk 200
295mm Hydraulic Borewell Machine Trailer Mounted Easy Mobile Gk 200
Product Details:
Place of Origin: China
Brand Name: ShiTan
Certification: ISO9001
Model Number: GK-200
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: USD4500-5800/SET
Packaging Details: wooden box
Delivery Time: Within 7-12 days
Payment Terms: T/T, Western Union
Supply Ability: 20000 sets per year
Contact Now
Detailed Product Description
Name: 295mm Trailer Mounted Easy Mobile GK 200 Hydraulic Borewell Machine Power Type: Diesel Or Motor
Voltage: 220v Dimension(L*W*H): 1730*860*1360
Application: Water Well,railways, Core Type: Small Core Drill Rig
Max Drilling Depth: 200 Meter Drilling Diameter: 295mm
Condition: New Color: Customized
Warranty: 24 Months OEM: Acceptable
High Light:

295mm hydraulic borewell machine

,

trailer mounted hydraulic borewell machine

,

easy mobile hydraulic borewell drilling machine

295mm Trailer Mounted Easy Mobile GK 200 Hydraulic Borewell Machine

 

 

GK 200 Hydraulic Borewell Machine Description

 

It is a lightweight shallow hole rig which can be drilling depth max 200M,diamter 75-300mm,with oil pressure feed.Mainly used for geological general investigation and exploration.self-propelled pneumatic drilling rig is suitable for industrial and civil drilling and ground temperature drilling. It has the advantages of large drilling diameter, deep drilling, fast footage, flexible movement, and wide application area.

 

GK 200 Hydraulic Borewell Machine Tech Details

 

GK 200 Drilling Rig
Drilling diameter(mm) 75,91,110,130,150,300
Drilling depth (m) 200,150,100,70,50,30
Drill pipe diameter (mm) 42,50
Drilling angle(°) 90~75
Equipment size(L * B * H) 1730 * 860 * 1360 (mm)
Rig weight (except engine) 700
Gyrator
Spindle speed (four gear) (r/min) 115,230,505,1010
Spindle travel(mm) 450
Spindle no-load lifting maximum moving speed(m/s) 0.05
Spindle no load drop maximum movement speed(m/s) 0.067
Spindle maximum feed pressure(KN) 15
Spindle maximum lifting force(KN) 25
Spindle maximum output torque(KN• m) 1.5
Winch assembly
Winch maximum lifting force (single rope) 20
Reel speed (r/min) 20,39,85,170
Reel circumferential speed(m/s) 0.172,0.345,0.738,1.476
Reel diameter(mm) 140
Wire rope diameter(mm) 9.3
Wire rope density (m) 40
Brake diameter(mm) 278
Brake band width (mm) 50

 

GK 200 Hydraulic Borewell Machine Features

 

1. Adopt Low speed high torque hydraulic motor drive rotary device output torque
2. The advantage of cylinder is promoting more stable, less failure significantly than the motor propulsion.
3. Equip two filter effectively to ensure the safety of diesel engine intake and prolong engine life.
4. It can readily monitor rig hydraulic system pressure and boost pressure to ensure the rig stable and efficient operation.
5.Using well-known brands of multi-way control valve, superior performance, handle centralized, easy to operate.

6,Small order is aceptable.
7,Good service and low price.
8,Fast reply.
9,12 Months quality guarantee.
10,Any third party testing is accepable.

 

GK 200 Hydraulic Borewell Machine Application

 

The drilling rig is suitable for engineering geological survey of buildings such as civil engineering, railways, hydropower, transportation, bridges, dam foundations, etc.; geological core drilling and physical exploration; small grouting holes, geothermal holes, blasting holes, drilling of various concrete detecting holes Advance; small well drilling, small pile hole.

 

Why is the water well drilling rig not suitable for use in rainy days?

 

After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large draw down pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain super elevation, and the frozen soil in the backfill in winter shall not exceed 15%.

 

295mm Hydraulic Borewell Machine Trailer Mounted Easy Mobile Gk 200 0

295mm Hydraulic Borewell Machine Trailer Mounted Easy Mobile Gk 200 1

295mm Hydraulic Borewell Machine Trailer Mounted Easy Mobile Gk 200 2295mm Hydraulic Borewell Machine Trailer Mounted Easy Mobile Gk 200 3

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: cathy

Tel: 13343314303

Send your inquiry directly to us
Jinzhou City Shitan Machinery Equipment CO. LTD.
Xiaoshang Village,Jinzhou City,Hebei province,China
Tel:86--15511892512
Mobile Site Privacy Policy | China Good Quality Water Well Drilling Rig Machine Supplier. © 2020 - 2024 drillingrigmachines.com. All Rights Reserved.