Send Message
Tel:
Jinzhou City Shitan Machinery Equipment  CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Home ProductsWater Well Drilling Rig Machine

High Speed ST180 Water Well Drilling Rig Large Pneumatic Rig For Civil Commerical

High Speed ST180 Water Well Drilling Rig Large Pneumatic Rig For Civil Commerical

  • High Speed ST180 Water Well Drilling Rig Large Pneumatic Rig For Civil Commerical
  • High Speed ST180 Water Well Drilling Rig Large Pneumatic Rig For Civil Commerical
High Speed ST180 Water Well Drilling Rig Large Pneumatic Rig For Civil Commerical
Product Details:
Place of Origin: Hebei ,China
Brand Name: Shitan
Certification: ISO 9001
Model Number: ST-180
Payment & Shipping Terms:
Minimum Order Quantity: 1set
Price: Negotiable
Packaging Details: Wooden Package
Delivery Time: 5 days after payment
Payment Terms: T/T, Western Union,
Supply Ability: 2000 sets/month
Contact Now
Detailed Product Description
Product Name: High Speed ST180 Water Well Drilling Rig Drilling Depth: 180m
Drilling Hole Diameter: 105-180mm Weight: 4.5T
Walking Speed: 2.5km/h Climbing Angles (Max.): 30
Equipped Capacitor: 55KW Drill Pipe Diameter: 76/89mm
Voltage: Diesel Engine Driven Place Of Origin: Hebei,China
Warranty: 12 Month After Sale Service: Video Support
High Light:

iso water well drilling rig equipment

,

180m water well drilling rig equipment

,

180m water well drilling rig machine

High Speed ST180 Water Well Drilling Rig Large Pneumatic Rig For Civil Commerical

 
 
ST180 Water Well Drilling Rig Product Description
 

In practice, it is mainly used for dig water well, monitoring well, geothermal air-conditioner hole, and anchoring hole, especially the groundwater exploiting projects,it is a newly-developed multifunctional hydraulic driller, it is highly efficient and energy saving. .Pneumatic water well drilling machine should be used together with air compressor, it can add mud pump and foam pump. Need to use different drilling tools such as: drill rod, hammer, rock drill bits, etc

 

ST180 Water Well Drilling Rig Techical Data

Drilling RIg Name
ST180  Drilling Machine
Drilling hole diameter
140-254mm
Drilling depth
180m
One-time advance length
3.3m
Walking speed
2.5km/h
Climbing angles (Max.)
30
Equipped capacitor
55kw
Using air pressure
1.7-2.5mpa
Air consumption
17-31m³/min
Drill pipe length
1.5m, 2.0m, 3.0m
Drill pipe diameter
76mm, 89mm
Rig lifting force
12t
Swing speed
45-65rpm
Swing torque
3200-4600(N.m)
Dimension
3800*1500*2200mm
Weight
4500kg

 

ST 180 Water Well Drilling Rig Advantages

 

The water well drilling machine can only be used after all parts are firmly installed and connected before being used for drilling. The following are the relevant operation steps for adding and connecting the drill pipe of the water well drilling machine: 1. When it is necessary to add and connect the drill pipe at the depth of one drill pipe after drilling, stop the propulsion first, then stop the rotation, and turn off the cooling water; 2. Operate the clamping handle to make the gripper clamp the drill pipe and open the micro regulating flow valve (right rotation); 3. The gyrator reverses, at the same time, it retreats the feed oil cylinder to rotate the water braid shaft away from the drill pipe; 4. Stop the rotation and operate the fast forward and backward handle to the fast backward position to make the chuck quickly back in place; 5. Connect the drill pipe to be added to the previous drill pipe, and the rotator moves forward while rotating. When the trapezoidal conical thread of the water braid shaft is in screw contact with the conical thread of the newly added drill pipe, immediately operate the gripper handle, loosen the gripper and complete the drill pipe addition
 
FAQ 
 

Q1: Are you factory or trade company?
A1: We are factory. 
Q2: What the exactly address of your factory?
A2: Our company is located in Jinzhou ,Shijiazhuang,Hebei, China
Q3: Warranty terms of your machine?
A3: One year warranty for the machine and technical support according to your needs.
Q4: Will you provide some spare parts of the machines?
A4: Yes, of course.
Q5: What about the voltage of products? Can they be customized?
A5: Yes, of course. The voltage can be customized according to your equirement.
Q6: Which payment term can you accept?
A6: 30% T/T in advanced, 70% T/T before shipment
Q7: How long will you take to arrange production?
A7: 380V 50HZ we can delivery the goods within 7-15 days. Other electricity or other color we will delivery within 25 days.

 

How do the drillers replace the bit?

 

During drilling, the power of the drilling rig drives the rotary table, Kelly, drill pipe and drill bit to rotate. Observe the working condition of the down hole drill bit through the instruments on the ground of the drilling rig. After comprehensive judgment, if the drill bit is considered to have been worn, stop drilling immediately and replace the drill bit. After the drilling is stopped, the drilling fluid circulation shall be maintained for a period of time. The purpose is to adjust the performance of the drilling fluid, bring the rock cuttings suspended in the drilling fluid out of the ground, circulate to keep the new borewell wall stable, and conduct routine inspection of the drilling equipment. The driller uses the crown block, traveling block and hook on the derrick to pull out all drilling tools from the well according to the height of the derrick and the column (usually composed of two or three drill pipes). After pulling out, the drill pipe column is discharged into the derrick in sequence. While lifting the down hole drill string, the drilling fluid shall be continuously injected into the annular space with the drilling pump to keep the liquid level in the borewell from falling, so that the pressure in the borewell can balance the formation pressure, so as to prevent the borewell from collapsing or the fluid in the down hole formation from entering the borewell. At the same time, pay special attention to the possible sticking of the drill pipe due to the wall shrinkage, and the operator shall strictly control the lifting speed. After all the drill pipes and drill collars in the borewell are pulled out, the drill bits to be replaced will be pulled out at the same time. The workers can resume drilling after unloading the old drill bits, installing new drill bits and lowering them into the well according to the original column sequence.

 

High Speed ST180 Water Well Drilling Rig Large Pneumatic Rig For Civil Commerical 0

 

High Speed ST180 Water Well Drilling Rig Large Pneumatic Rig For Civil Commerical 1

High Speed ST180 Water Well Drilling Rig Large Pneumatic Rig For Civil Commerical 2High Speed ST180 Water Well Drilling Rig Large Pneumatic Rig For Civil Commerical 3

High Speed ST180 Water Well Drilling Rig Large Pneumatic Rig For Civil Commerical 4High Speed ST180 Water Well Drilling Rig Large Pneumatic Rig For Civil Commerical 5

 

 

 

 

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: cathy

Tel: 13343314303

Send your inquiry directly to us
Jinzhou City Shitan Machinery Equipment CO. LTD.
Xiaoshang Village,Jinzhou City,Hebei province,China
Tel:86--15511892512
Mobile Site Privacy Policy | China Good Quality Water Well Drilling Rig Machine Supplier. © 2020 - 2024 drillingrigmachines.com. All Rights Reserved.