Send Message
Tel:
Jinzhou City Shitan Machinery Equipment  CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Home ProductsWater Well Drilling Rig Machine

XY-1B 70m Oil Types Of Borehole Drilling Machine

XY-1B 70m Oil Types Of Borehole Drilling Machine

  • XY-1B 70m Oil Types Of Borehole Drilling Machine
  • XY-1B 70m Oil Types Of Borehole Drilling Machine
XY-1B 70m Oil Types Of Borehole Drilling Machine
Product Details:
Place of Origin: China
Brand Name: ShiTan
Certification: ISO9001
Model Number: GK-200
Payment & Shipping Terms:
Minimum Order Quantity: Negotiation
Price: Negotiation
Delivery Time: Within 7-12 days
Payment Terms: L/C, D/A, T/T, Western Union
Contact Now
Detailed Product Description
Type: Core Drilling Rig Power Type: Diesel
Model Number: XY-1B Usage: Coal, Oil
Voltage: 380V Power(W): 15KW
Dimension(L*W*H): 1820*980*1400mm
High Light:

70m Borehole Drilling Machine

,

Types Of Borehole Drilling Machine

,

XY1B Diamond Core Drilling Rig

200m Depth Water Well Drilling Rig Geological Prospecting Core Drilling Rig Machine

 

 

XY-1B Drilling rig

 

XY-1B Drilling rig with hydraulic feeding is widely utilized and featured in high power and hoisting load(2T),Large torque transmission,etc.The rotating speed of vertical hexagonal spindle varies between 71r/min-825r/min.It is suited for the geotectonic survey,geological core drilling,small hole drillings for grout,blast and water well in railway,water conservancy,bridge,dam foundation and other construction.Diamond drill vit,alloy drill bit and steel roller drill bit are available for drilling according to different geological structures.

 

Technical Specifications:

 

Drilling Depth 200m, 150m, 100m, 70m, 50m, 30m
Hole diameter for different depth 75mm,91mm,110mm,130mm,150mm,300mm
Drill rod diameter 42mm
Angle range 90°-75°
Dimensions(L*W*H) 1710mm*860mm*1360mm
Weight(without power unit) 525KGS
Rig traveling device XY-1B-150
Migration distance 350mm
Distance from a drilling hole 300mm
Swivel Head
Spindle speed(4-speed) 71,142,310,620r/min
Spindle stroke 450mm
Upward displacement speed of idling vertical spindle 0.05m/s
Downward displacement speed of idling vertical spindle 0.067m/s
Spindle pull-down max 15KN
Spindle lifting capacity max 25KN
Spindle Max Torque 1.5KN.m
Brake dia 278mm
Brake belt width 50mm
Hoist
Max.lifting capacity(single rope) 20KN
Hoisting drum linear velocity(two levels) 0.172,0.345,0.738,1.476m/s
Hoisting drum revolution 20,39,85,170r/m
Drum dia 140mm
Wire rope dia 9.3mm
Wire rope capability 40mm
Oil pump
Model YBC-20/125
Rated pressure 12.5Mpa
Displacement 20ml/r
Rated speed 800-2500r/min
XY-1B-150 water pump
Model Hydraulic reciprocating single-acting piston pump
Displacement max. 95(77)L/min
Working pressure max. 1.2Mpa
Rated pressure 0.7Mpa
Liner diameter 80mm
Piston stroke 100mm
Power(diesel engine or motor)
Model(Diesel engine) 1115
Rated power 16.2KW
Rated speed 2200r/m

 

Precautions in operation of automatic hydraulic drilling machine:

 

1. When there is a drilling tool in the hole, the rotator is not allowed to reverse except as required by the specified procedure.

2. When the rotator reverses to dismantle the drill pipe, the oil cylinder must leave enough break out stroke to avoid damaging the drill pipe thread.

3. During the working process of drilling machine, attention should be paid to the changes of moving parts at any time. The temperature rise of bearings, gears, oil pumps, oil motors, motors, etc. shall not exceed 45 degrees, and the temperature at the oil outlet of the oil tank shall not exceed 60 degrees. Otherwise, the machine shall be shut down for inspection and treatment.

4. Observe the return oil pressure gauge of the pump station. If the return oil pressure exceeds 0.35, stop the machine to replace or clean the filter.

5. When the drilling machine is working, pay attention to whether there is oil leakage in the hydraulic system components, rubber pipes and pipe joints. If there is any fault, it should be handled in time.

6. When the drilling machine is working, in addition to the corresponding changes in the oil supply pressure, rotation and propulsion speed caused by the change of drilling load, the system pressure suddenly rises and falls sharply, which causes great changes in rotation and propulsion speed. Therefore, the drilling machine should be shut down immediately to find out the causes. Deal with the fault.

7. When the drilling machine stops working, all handlebars should be in the middle position.

8. When the drill pipe is normally withdrawn from the drill pipe, it is necessary to use the holder or rod clamp to clamp the drill pipe tightly. After the rod taking personnel must leave the safe place 1 m away from the drill pipe, the drilling machine driver can be asked to start the drilling machine to withdraw the drill pipe according to the operation regulations. In the process of pulling out the drill pipe, the rod taking personnel and the drilling machine driver must cooperate closely, take care of each other, concentrate their energy, and prevent accidents caused by misoperation.

9. When the connection joint between the water identification shaft and the drill pipe is blocked, and the rod clamp or rod clamp can not be used, the pipe wrench can be used to clamp the drill pipe, and the extension rod (0.5-1m) is used to connect the pipe tong (increase the torque), and then the joint of the drill pipe will be released manually.

10. When the connection joint between the water identification shaft and the drill pipe is stuck, and it is impossible to use the pipe clamp or rod clamp, the pipe tongs can be used to clamp the drill pipe. One end of the pipe tongs only relies on the frame as the fulcrum, and the pipe tongs are fixed on the frame with iron wire. After the personnel in the drilling field leave the drilling field and arrive at a safe place, the drill pipe driver can start the drilling machine to reverse and loosen the drill pipe, so as to prevent the pipe tongs from flying off and injuring people due to misoperation.

11. When the dip angle of the drill pipe is greater than 30 °, when handling the broken rod, the operator's position shall not be directly opposite to the drill pipe, so as to prevent the drill pipe from sliding out and injuring people.

 

XY-1B 70m Oil Types Of Borehole Drilling Machine 0

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Anna

Tel: 15511892512

Send your inquiry directly to us
Jinzhou City Shitan Machinery Equipment CO. LTD.
Xiaoshang Village,Jinzhou City,Hebei province,China
Tel:86--15511892512
Mobile Site Privacy Policy | China Good Quality Water Well Drilling Rig Machine Supplier. © 2020 - 2024 drillingrigmachines.com. All Rights Reserved.