Send Message
Tel:
Jinzhou City Shitan Machinery Equipment  CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Home ProductsPortable Water Well Drilling Rig

200 Meters Depth Geotechnical Machinery Portable Water Well Drilling Rig

200 Meters Depth Geotechnical Machinery Portable Water Well Drilling Rig

  • 200 Meters Depth Geotechnical Machinery Portable Water Well Drilling Rig
  • 200 Meters Depth Geotechnical Machinery Portable Water Well Drilling Rig
200 Meters Depth Geotechnical Machinery Portable Water Well Drilling Rig
Product Details:
Place of Origin: China
Brand Name: ST
Certification: ISO
Model Number: GK 200
Payment & Shipping Terms:
Minimum Order Quantity: 1 SET
Price: EXW $2000-4000
Packaging Details: 1, plastic bags inside,wooden boxes outside,or as customers'request 2, seaworthy packing
Delivery Time: 5 days after advance payment
Supply Ability: 2000 set/year
Contact Now
Detailed Product Description
Product Name: 200 Meters Depth Geotechnical Machinery Portable Water Well Drilling Rig Max. Drilling Depth (m): 200 Meters
Max. Drill Pipe Diameter (mm): 42mm,50mm Spindle Speed (four Gear) (r/min): 71,182,310,790
Size(L * B * H): 1640 * 1030 * 1440 (mm) Rig Weight (except Engine): 600
Model: GK 200 Color: Yellow,blue,red
OEM: Acceptable Warranty: 12 Months
High Light:

water borehole drilling equipment

,

hydraulic water well drilling machine

200 Meters Depth Geotechnical Machinery Portable Water Well Drilling Rig

 

 

Product Description

 

This rig is to solve the problems of well drilling, geological exploration, soil testing, etc . it is a kind of medium shallow hole core drilling machine. The utility model has the advantages of small size, light weight, large power and wide range. It is especially available for constructions of hydroelectric power station, highway, railroad and harbor etc.

 

Product Specifications

 

Drilling Rig
Drilling diameter(mm) 75,91,110,130,150,300
Drilling depth (m) 200,150,100,70,50,30
Drill pipe diameter (mm) 42,50
Drilling angle(°) 90~75
Equipment size(L * B * H) 1730 * 860 * 1360 (mm)
Rig weight (except engine) 700
Gyrator
Spindle speed (four gear) (r/min) 115,230,505,1010
Spindle travel(mm) 450
Spindle no-load lifting maximum moving speed(m/s) 0.05
Spindle no load drop maximum movement speed(m/s) 0.067
Spindle maximum feed pressure(KN) 15
Spindle maximum lifting force(KN) 25
Spindle maximum output torque(KN• m) 1.5
Winch assembly
Winch maximum lifting force (single rope) 20
Reel speed (r/min) 20,39,85,170
Reel circumferential speed(m/s) 0.172,0.345,0.738,1.476
Reel diameter(mm) 140
Wire rope diameter(mm) 9.3
Wire rope density (m) 40
Brake diameter(mm) 278
Brake band width (mm 50

 

 

Product Main Features:

 

1. Very powerful at soil, sand, hard rock, etc. land condition.

2. Three kinds drill bits (three-wing bit, alloy bit and diamond bit) available for your choice, which can drill both soft and hard ground, especially

diamond drill bit effective in drilling hard rocks.

3. Hydraulic control system for greatly improving the working efficiency, saving labor force.

4. Mounted wheel or trailer, can be hauled easily by car or tractor, convenient to transport.

5. Power can be diesel engine or electric motor, as per your request.

 

What aspects should we pay attention to in the drilling process of water well drilling rig?

 

Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.

1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.

2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.

3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.

 

Inspection procedures for core drilling rig

 

I. Routine appearance inspection

(1) Regularly check whether the paint on the surface layer of the drilling rig is loose, mainly whether the operating parts are rusty;

(2) Regularly check whether the reinforcement is loose;

(3) Regularly check the welding position for faulty welding and desoldering.

II. Idle test run

(1) Carry out no-load actual operation of the drilling rig according to the safety operation procedures, and idle for 20 minutes;

(2) Regularly check whether the operation of the hydraulic transmission system is OK, whether the hydraulic seals, oil pipes and connectors have oil leakage, whether the temperature is OK, and whether the vacuum pressure gauge is OK;

(3) Regularly check whether the reinforcement is loose and whether various practical operations are sensitive and reliable.

 

200 Meters Depth Geotechnical Machinery Portable Water Well Drilling Rig 0200 Meters Depth Geotechnical Machinery Portable Water Well Drilling Rig 1200 Meters Depth Geotechnical Machinery Portable Water Well Drilling Rig 2200 Meters Depth Geotechnical Machinery Portable Water Well Drilling Rig 3

200 Meters Depth Geotechnical Machinery Portable Water Well Drilling Rig 4200 Meters Depth Geotechnical Machinery Portable Water Well Drilling Rig 5200 Meters Depth Geotechnical Machinery Portable Water Well Drilling Rig 6

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: cathy

Tel: 13343314303

Send your inquiry directly to us
Jinzhou City Shitan Machinery Equipment CO. LTD.
Xiaoshang Village,Jinzhou City,Hebei province,China
Tel:86--15511892512
Mobile Site Privacy Policy | China Good Quality Water Well Drilling Rig Machine Supplier. © 2020 - 2024 drillingrigmachines.com. All Rights Reserved.